Appendix C - SDAP State Code 1
Performance outcomes Acceptable outcomes Response
AO11.4 Development does not worsen the
condition of an existing lawful point of
discharge to the state-controlled road.
Flooding
PO12 Development does not result in a AO12.1 For all flood events up to 1% annual Complies – The proposed development requires
material worsening of flooding impacts within a exceedance probability, development results minimal earthworks and will not result in the material
state-controlled road. in negligible impacts (within +/- 10mm) to worsening of flooding impacts (refer Earthworks Plan –
existing flood levels within a state-controlled Attachment 1).
road.
AND
AO12.2 For all flood events up to 1% annual
exceedance probability, development results
in negligible impacts (up to a 10% increase) to
existing peak velocities within a state-
controlled road.
AND
AO12.3 For all flood events up to 1% annual
exceedance probability, development results
in negligible impacts (up to a 10% increase) to
existing time of submergence of a state-
controlled road.
Drainage Infrastructure
PO13 Drainage infrastructure does not create a AO13.1 Drainage infrastructure is wholly Complies – The proposed development does not
safety hazard for users in the state-controlled contained within the development site, except require additional stormwater drainage infrastructure to
road. at the lawful point of discharge. be provided off the site and will not create a hazard for
users of the state-controlled road.
AND
State Development Assessment Provisions v3.0
State code 1: Development in a state-controlled road environment Page 4 of 17