Decision Letter - Change to an Existing Approval - 010.2007.00001294.002 [As Published] · 142007.1294.02
2007/1294
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager conditions.
4 ASSESSMENT MANAGER CONDITIONS
1. The development shall be carried out in accordance with Engineering drawings Nos.
DA-01B dated 11 December 2007 by Foster Designs
1703-0-1 dated 29 May 2007 by Construction Hydraulics
1703-0-2B dated 27 August 2007 by Construction Hydraulics
1703-0-3C dated 6 February 2008 by Construction Hydraulics
1703-0-4 dated 29 May 2007 by Construction Hydraulics
or as modified herein.
2. A report on the Identification and Mitigation of Acid Sulphate Soils, prepared in accordance with
Part 6 of SPP2/02 Guideline: Planning and Managing Development Involving Acid Sulphate
Soils is to be submitted for approval by the Manager Land Development 5 working days prior to
the commencement of any new building works.
3. Any damage or disturbance to the beach frontage or to the footpath, planter boxes and other
street improvements in Hastings Street that occurs during the construction of the proposed
development or occurs in the construction of any works necessary to connect the proposed
development to Council’s services infrastructure shall be reinstated in accordance with the
Hastings Street Masterplan with suitable matching materials to the satisfaction of Council’s
Manager of Design. These reinstatement works are to be undertaken at no cost to Council and
are to be completed prior to the commencement of the use permitted by this permit.
4. Roof and surface runoff connection to Council’s drainage system shall be as shown on drawing
No. 1703-0-2B.
5. A Traffic Management Plan for the development addressing all construction phases shall be
prepared by suitably qualified persons and submitted to Council for approval prior to the pre start
meeting. The report shall address, but not be limited to, all items listed below, further the plan
shall be flexible that it addresses all stages of the development:-
5.1 Limiting the routes for the heavy vehicles to the major road network and prohibit the use
of the local roads as access to the site,
5.2 The plan should detail the routing of trucks to and from the site.
5.3 Provision of onsite parking for personnel working on this development, as there is limited
parking available in adjacent streets.
5.4 Provision of safe cycle and pedestrian movements around the development on Hastings
Street and the beachfront.
5.5 No queuing of trucks is permitted on residential streets, especially prior to 7.00am.
Further parked trucks must have engines turned off.
5.6 Indicate the location of any holding areas for heavy vehicles.
5.7 Provision of signage and traffic controllers in accordance with Manual of Uniform Traffic
Control Devices and Traffic Infrastructure (Roads) Act.
5.8 Provide an indication where the surplus spoil is to be transported to, and/or source of
imported fill material.
6. The pathway and road pavement in Hastings Street adjacent to the entrance to the work site
shall be swept clean at regular intervals. The works shall be undertaken under traffic control
where applicable.
Page 2 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - 010.2007.00001294.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 63 KB (small file)
- File type
No other editions are linked here.