Minor Change Existing Approval - 132008 176 07 (As Published) · 132008.176.07
Clearing non-habitat trees
(d) After under scrubbing of each area is complete, non-habitat trees (i.e. trees other
than those identified as habitat trees) will be cleared and stockpiled for mulching.
Clearing of non-habitat trees will only occur where their removal will not impact on
identified habitat trees (e.g. canopies do not interconnect with habitat trees).
Hollow inspection and removal
(e) After under scrubbing and clearing on non-habitat trees, an elevated work platform
or cherry-picker will be used in conjunction with a chainsaw operator and suitably
qualified fauna spotter/catcher to inspect and remove hollows a necessary prior to
habitat tree felling.
(f) When the fauna has been safely secured within its hollow (or compensatory
habitat/nest box), the entire limb can then be placed in the cherry-picker bucket or
lowered to the ground using ropes depending on the size of the limb.
(g) The limb and/or compensatory habitat/nest box will then be placed in a cool, quiet
location until translocation to the recipient habitat site, when at dusk the hollow
entrance is re-opened to allow the fauna to emerge of its own accord.
73. Any proposed new fencing to delineate boundary alignments, with the exception of pool
fencing directly around pool areas, must be constructed to allow for the movement of fauna.
74. Twenty (20) permanent artificial nesting boxes must be installed within the Environmental
Management and Conservation Zone to provide compensatory habitat for arboreal mammals
and hollow dependent avian species. The works must be undertaken in accordance with an
Operational Works approval.
Bushfire Management
75. All works must be carried out in accordance with a Site Management Plan (or part thereof)
prepared by a qualified person* and endorsed through an Operational Works approval. The
Site Management Plan must incorporate all precautionary bushfire obligations required to
ensure landscape design measures are achieved that meet a low fuel state at all times and
provide management techniques for the development site administrators to consider as part
of the development construction and ongoing maintenance.
*(Refer to Advisory Note)
76. Certification must be submitted to Council from a qualified person* which certifies that the
development has been constructed in accordance with the bushfire management conditions
of this Decision Notice.
*(Refer to Advisory Note)
77. A Bushfire Evacuation Plan for the site must be prepared by a qualified person* and
submitted to Council prior to the issue of any Development Permit for Operational Works.
*(Refer to Advisory Note)
78. A copy of the Bushfire Evacuation Plan for the development must be provided to the nearest
fire authority.
Waste Management
79. A Waste Management Plan must be prepared that details the type and quantity of waste
material that is likely to be generated by the development; where and how the waste will be
stored, disposed of and procedures for handling the waste. The Waste Management Plan
must be submitted and approved by Council prior to the issue of a Development Permit for
Operational Works.
Page 12 of 31
Document Set ID: 24809674
Version: 9, Version Date: 27/05/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 132008 176 07 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.