Minor Change Existing Approval - 132008 176 07 (As Published) · 132008.176.07
80. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9 - Waste Management. The facilities must include an impervious
area, within the site, correctly sized for all refuse and recycling containers and suitably
screened from public places and neighbouring properties. A bin wash area is required with a
cold-water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain outlet
must be designed to prevent storm water entry to the sewerage system.
Energy & Water Efficiency
81. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
82. All new kitchen, laundry and bathroom fittings shall comply with the AAA Water Conservation
Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating and
Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), or
current equivalent standards as may apply, with toilets to comply with the AAAA Water
Conservation Rating System. All new tap ware and shower roses shall not exceed a
maximum flow of 9 litres per min. Dishwashers and washing machines are excluded from
this requirement.
5. REFERRAL AGENCIES
Referral Status Referral Agency and Referral Trigger Response
Address
Concurrence SARA at DILGP SARA Schedule 10, Part 9, The agency provided
at DILGP Via MyDAS2 Division 4, Subdivision 1, is response on 27
at https://prod2.dev- Table 1, Item 1 – June 2025
assess.qld.gov.au/suite Development impacting (Reference No
/ (for assistance, on sate transport 22070) A copy of the
contact DILGP at 5352 infrastructure response is attached
9701 or Schedule 10, Part 10,
email:SEQNorthSARA Division 3, Subdivision 3,
@dilgp.qld.gov.auConc Table 1 – Development
urrenceSARA interfering with koala
habitat in koala habitat
areas outside koala
priority areas
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Building and Construction Industry (Portable Long Service Leave) Levy
1. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.
Co-ordination of Operational Works Assessment
2. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will result
if all works are lodged in a single application.
Page 13 of 31
Document Set ID: 24809674
Version: 9, Version Date: 27/05/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 132008 176 07 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.