Council archive · source document
001AA83A.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
: INTEGRATED PLANNING ACT 1997 , , , - _IDAS Assessment Checklist, Version 22 , .
WILD RIVER'AREA ita 7005/05 000! SOR OUE NSIS Rei we aes ier CE Meas a a oman)
| Is afy of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
[No -Gotoas16 §=©[_VYes.
if yes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to be
“assessable? .
(i) Agricultural activities as defined under the Wild Rivers Act 2005 (No C1 Yes
: ' (i) Animal husbandry activities as defined under the Wild Rivers Act 2005 [I No. [J Yes
oo ff yes-to either (i) or (ii) above, is any part of the premises in the wild river high preservation area?
OJ Yes - An application for the operational work will be taken to be no! properly made and the Assessment Manager must refuse to receive it. ;
- LINo Lo | oe i
, If no, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005?
a ; (J Yes - An application for ihe operational work will be taken to be not property made and the Assessment Manager must retuse lo receive it
C] No -.Uniess the application Is consistent with any property development plan applying fo the land, the Assessment Manager must refuse to
, , . ‘receive it (Complete Form 1, Part Q if agricuiture. Complete Form 1, Part R if animal husbandry} Subject to the dectaration for the ,
. . . - relevent wild river area, this application requires assessment by the Department of Natural Resources and Water (NRW). If NRWis not } :
. : ‘ the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. -
IPA, schedie 8, part 1, table 4, tem 10; JP Regitetion, schedule 2, table 2, dem 37; Wid Rivers Aci 2005, sectiosis 42. 2A : .
. . [STATE:CONTROLLEDIROAD SaMhie SEMA one i, chai Seat Re aCe Co a creo]
‘14.16 | Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
[?] No - End of section4 [J Yes uo
If yes, is the proposed operational work associated with either - : ,
+ Amaterial change of use that is assessable under the planning scheme; or : CINo (L1Yes
ot « — Reconfiguring a lot that increases the total number of lots, or increases the total number of lots
_abutting the State-controlled road Bas
. fo, and answers to questions in this section of the checklist indicate the propose operational work is asséssable under , -°?
; IPA, schedule 8 - Answer {a)-(c) below. © ‘ . ‘
. (a) Is any of the proposed operational work associated with access toa State-controlled road? ,
LJ No “{_] Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency,
. . - (b) ‘Is any of the Peres operational work for filling or excavation? .
|. C1 No Yes . ;
. - . aN is the operational work proposed in a future State-controlied road not defined by route? . ‘
. No - This application must be referred to the Department of Main Roads {DMR} as Concurrence Agency. ~ .
: . oO Yes - This application must be referred to the DMR as Advice Agency. - .
; _{c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
. through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controtled road?
: ‘TINo > DlYes_ - /
. an is the operational work proposed in a future State-controlted road not defined by route?:
. No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(71 Yes - This appfcation must be referred to the DMR as Advice Agency. , . .
IP Regulation, schedule Z late 2 tem. :
a . Page 39 . . .See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001AA83A.001.pdfRelated documentPublic source context ↗
09/0695 - Operational Works - Driveway [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.