Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Cooran - Development Application

Attached to the e-mail Service & Utility Type 3 Tower (Telecommunications) -MCU18/0166.

of 156

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Proposed nbn Telecommunications Facility on Lot 22 SP148684
Appendix C – Code Assessment



 Specific Outcomes                            Probable Outcomes                          Compliance
                                                                                         Accordingly, the proposal is considered compliant with
                                                                                         Specific Outcome O4.


 Safety and security                          S5.1 For Installations and Towers—the      Complies.
 O5 Infrastructure Uses are secure            use is fenced with security fencing;       The lease area for the facility will be surrounded by a
 and    potential   impacts   from            AND                                        2.4 m high chain link fence and will prevent public
 vandalism are minimised.                     S5.2 For other Infrastructure Uses—no      access to any unauthorised personnel, which is
                                              probable solution.                         consistent with the outcomes sought in Probable
                                                                                         Outcome O5.


 Artificial lighting                          S6.1 Lighting associated with the use is   Not Applicable.
 O6 The generation of spill light by          designed,    installed,   operated  and    The facility will not require the installation of lighting.
 development, which gives rise to             maintained in accordance with Section 3
 annoyance, discomfort, distraction           of AS4282 The Control of the Obtrusive
 or a reduction in the ability to see         Effects of Outdoor Lighting.
 essential information, is avoided.


 Mechanical plant and equipment               S7.1 Plant and equipment are—              Not applicable.
 O7 Mechanical plant and equipment            a) located more than 2m from any           The proposed development is not for mechanical plant
 (including    air     conditioning           property boundary; and                     and equipment.
 equipment) are—                              b) screened by dense vegetation or
 a) positioned to minimise adverse            fencing (i.e. 1.5m wide vegetated buffer
 impacts on the amenity of any                area);
 residential premises;
 b) designed and positioned to                OR
 visually integrate with the building
 and roof design; and
Log in to download the original file

Cooran - Development Application.pdf · 12.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.