Cooran - Development Application
Attached to the e-mail Service & Utility Type 3 Tower (Telecommunications) -MCU18/0166.
The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Proposed nbn Telecommunications Facility on Lot 22 SP148684
Appendix C – Code Assessment
Specific Outcomes Probable Outcomes Compliance
c) appropriately screened. S7.2 Plant and equipment are located
within a building.
Environment & heritage values No solution provided. Complies.
O8 There are no significant adverse It is acknowledged that some vegetation clearing is
effects on the biodiversity, natural required for the compound area, construction area
vegetation, native wildlife, habitats, and access track. The proposed facility has been
landscape quality, water quality or intentionally sited on a property which contains dense
heritage values, including those vegetation in order to utilise natural screening
related to— benefits. Furthermore, the subject site has been
a) changes to natural drainage; located outside of areas mapped as containing areas
b) disturbance to any of the of environmental importance.
wetland systems;
c) management of landslide and Clearing will be minimal as the proposed facility has
fire risk; been located in an area largely void of mature
d) erosion and the transport of vegetation.
sediments off-site;
e) unmanaged public access;
All clearing activities will be undertaken in accordance
f) effluent disposal;
g) changes to fauna habitat and with nbn construction management plans, including
measures to avoid impacts to fauna species, and
behaviour; and
h) disturbance of buildings and vegetation outside of the clearing footprint. All other
vegetation on site will be maintained for screening
features, including natural
features, of heritage purposes, and clearing of vegetation will only be
conducted where necessary.
significance.
The proposed facility is located approximately 120 m
north of the closest known waterway (Falls Creek).
Given the relatively small scale of the earthworks
See the original
The page text is free to read. Viewing or downloading an original file needs an account.