Cooran - Development Application
Attached to the e-mail Service & Utility Type 3 Tower (Telecommunications) -MCU18/0166.
The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
can be established to provide Fixed Wireless internet services to a local
community. The key technical parameters for the sites require:
• Distance to the users, and network capacity -the ability for each facility
to service the maximum number of customers while ensuring the product
specifications are met.
• Each radio network is sited and designed to communicate with the
maximum possible number of customers in their homes or business
premises.
• Locating an nbn™ Fixed Wireless facility too far away from the intended
users will compromise download speeds.
• Locating an nbn™ Fixed Wireless facility in a de-centralised position
relative to the coverage area will reduce the number of sectors it can be
designed with, significantly reducing the capacity or service delivery of a
facility.
3.3 Candidate Site
3.3.1 Opportunities to Co-locate
nbn investigated co-locating equipment and antennas on the existing Telstra
facility at 265 Tablelands Road, Cooran. This 25 m high monopole has previously
been extended by 5 m and currently holds equipment from Telstra, Vodafone
and GWN.
Considering the above, the maximum height available for nbn to co-locate on
this facility would be approximately 20 m. Furthermore, the relative ground
height of the existing Telstra facility is approximately 15m lower than the
proposed site. Although collocating at a height of 20m would provide a ‘low-
impact’ solution, nbn would not be able to provide a good/reliable service to the
targeted premises.
In order to co-locate by replacement of the existing facility, a stronger and taller
facility would be required in order for nbn to achieve good/reliable service to
the intended community, whilst also accommodating Telstra, Vodafone and
GWN’s existing and future (reserved) equipment. A new facility in this location
would likely require a 50m lattice tower structure to accommodate for the
relatively lower ground elevation and to ensure that the structural integrity of
the facility is maintained. A larger lattice tower was not considered a desirable
outcome, as it was determined a new greenfield facility could be designed as a
less obtrusive 35 m monopole to provide service to the community.
Therefore, co-location on this facility was discounted.
13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.