Original source · versioned page text
Cooran - Development Application
Attached to the e-mail Service & Utility Type 3 Tower (Telecommunications) -MCU18/0166.
The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Figure 3.1: Opportunities to Co-locate (Source: Google Earth)
3.3.2 Existing Structures
Where possible, nbn have investigated opportunities to utilise other forms of
existing infrastructure to ‘co-site’. Using desktop analysis and site inspection,
no opportunities for ‘co-siting’ were identified.
3.3.3 Greenfield Candidate
nbn recognises the sensitivity associated with such a proposal and strives to
strike a balance between providing services and minimising the impacts on the
locality. During the site selection process, which involves identifying several
potential locations to site the telecommunication facility, a number of factors
are taken into consideration. These include, achieving coverage requirements
for the area as well as planning objectives, co-location opportunities and
property and construction requirements. nbn endeavours to avoid locating
search areas in close proximity to residential localities and potentially sensitive
land uses, where practicable.
A total of six (6) candidates were investigated within the Cooran area. Of these
candidates, four (4) candidates were not interested in nbn’s proposal (refer to
14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.