Original source · versioned page text
Cooran - Development Application
Attached to the e-mail Service & Utility Type 3 Tower (Telecommunications) -MCU18/0166.
The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
which apply to certain development, if the relevant state interests have not been
appropriately integrated into the planning scheme.
The SPP has not been reflected within The Noosa Plan. An assessment against
the applicable themes of the SPP has been provided in Table 6.1 below.
Table 6.1 State Planning Policy
State Interest Assessment Compliance
Natural Hazards – A development application The subject site is identified under
• Flood hazard for a material change of use, the SPP mapping as being located
area* - Level 1 reconfiguring a lot or within a Flood Hazard Area – Level 1
– Local operational works on land – Local Government Flood Mapping
Government within: Area, and Bushfire Prone Area
flood mapping (Medium Potential Bushfire
• A flood hazard area, Potential).
area
or
• Bushfire • A bushfire hazard
Hazard area area, or Risk associated with bushfire
(Bushfire Prone • A landslide hazard hazards represent an important
Area) area; or consideration for siting and
• A coastal hazard area development decision making.
• For all natural Nevertheless, the following design
hazards: and siting features have been
applied to mitigate the risks of a
Development: bushfire hazard:
• The facility will not increase
1. Avoids natural hazards bushfire risk, given that it
areas or mitigates the does not involve hazardous
risks of the natural materials or emit undue heat,
hazards; and sparks or open flame;
2. Supports, and does not • The tower has been designed
unduly burden, disaster to be resilient to bushfire
management response or damage;
recovery capacity and • The proposed use will not
capabilities; and increase the number of
3. Directly, indirectly and people living or working in
cumulatively avoids an the area
increase in the severity of • Power cabling will be run
the natural hazards and underground from the point
the potential for damage of supply to the meter board
on the site or to other and again to the equipment
properties; and cabinet reducing the risk of
4. Avoids risks to public weather damage that may
safety and the result in malfunction;
environment from the • cable trays will be enclosed in
location of hazardous galvanised casing; and
materials and the release
of these materials as a
28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.