result of a natural • The equipment cabinet and
hazard; and meter board will be designed
to resist ember penetration.
Maintains or enhances
natural processes and the
protective function of With regards to risks associated with
landforms and vegetation flooding, it is noted that the local
that can mitigate risks government flood mapping indicates
associated with the natural that the site is not subject to
hazard flooding. Notwithstanding this, the
proposed development will not
substantially increase the
impermeable surface area of the
site. The proposed lease area is
approximately 0.063% of the total
site area. Due to the small lease
area, the proposed development is
unlikely to increase the severity of
flooding.
Biodiversity – (1) Development is located The subject site is identified under
• MSES - in areas to avoid the SPP mapping as containing MSES
Wildlife significant impacts on - Wildlife Habitat.
habitat matters of national
environmental It is acknowledged that vegetation
significance and clearing is required for the proposed
considers the facility, construction area and access
requirements of the track. However, the proposed
Environment Protection facility has been located in an area
and Biodiversity largely cleared of woody vegetation,
Conservation Act 1999. and avoids the need to clear
remnant vegetation regulated under
(2) Matters of state the Vegetation Management Act
environmental 1999. Furthermore, the proposed
significance are identified facility has been located adjacent to
and development is a cleared area that is close to
located in areas that existing infrastructure to minimise
avoid impacts; where total clearing and to ensure that
adverse impacts cannot clearing will not result in
be reasonably avoided fragmentation or connectivity of
they are minimised. animal habitats.
(3) Matters of local The subject site, under the DES flora
environmental survey trigger mapping, is not
significance are identified identified within a ‘high risk’ area
and development is (refer Appendix D). Therefore, a
located in areas that pre-construction flora survey will not
29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.