Cooran - Development Application

Attached to the e-mail Service & Utility Type 3 Tower (Telecommunications) -MCU18/0166.

of 156

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

         Overall Outcomes                                   Compliance

 reasonable requirements of the particular     only times vehicle access will be required
 land use;                                     is during the installation of the equipment
                                               and maintenance periods 3-4 times a
 e) Adequate provision is made for the         year. There is sufficient parking and
 standing, parking, loading and unloading,     manoeuvring space on-site for vehicles
 access and manoeuvring of service             during these periods.
 vehicles within the development site;

 f) Development does not adversely impact
 on existing public parking;

 g) Adequate monetary contributions are
 made in circumstances where Council
 considers the provision of external parking
 will fulfil the parking demand generated by
 the development and will not have an
 adverse impact on existing public parking;
 and

 h) Vehicular access does not impact
 adversely upon existing landscaping or
 native vegetation.




The Development is considered to comply with the overall outcomes of the
Driveways and Car Parking Code. For these reasons further compliance with the
performance outcomes of the Driveways and Car Parking Code code is not
considered necessary.

6.3.4.2.4 Earthworks Code

The Overall Outcomes of the Earthworks Code have been considered against the
proposal in Table 7.5 below.

Table 7.5 - Compliance with Overall Outcomes of the Height of Buildings and Structure
Overlay Code


         Overall Outcomes                                   Compliance

 a) To ensure that earthworks do not           Complies.
 unreasonably impact on the natural
 environment or other properties with          The proposed facility will be located within
 regard to –                                   a lease area of approximately 120 m2.
                                               Earthworks are required to construct the
                                               facility, but will be minimal and limited to
                                               the     extent     required   to   establish
                                               appropriate foundations for the monopole

                                                                                        47
Log in to download the original file

Cooran - Development Application.pdf · 12.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.