Original source · versioned page text
Cooran - Development Application
Attached to the e-mail Service & Utility Type 3 Tower (Telecommunications) -MCU18/0166.
The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Overall Outcomes Compliance
(i) Land stability (including and will not result in any adverse impacts
differential settlement or on land stability, drainage, soil
expansion in reactive soils); disturbance or existing amenity.
(ii) Contamination of land; Minimal vegetation clearing is required for
the establishment of the compound area,
(iii) Flooding and drainage; access track and construction area. The
subject site has been located outside of
(iv) Groundwater, watercourses
areas mapped as containing areas of
and wetlands;
environmental importance.
(v) Loss of native remnant or
regrowth vegetation; and
b) Earthworks are designed and
constructed to be structurally sound.
The Development is considered to comply with the overall outcomes of the
Earthworks Code. For these reasons further compliance with the performance
outcomes of the Earthworks Code is not considered necessary.
6.3.4.2.5 Landscaping Code
The Code for Landscaping is required to be assessed as part of this application.
The Overall Outcomes of this code have been considered against the proposal
in Table 7.6.
Table 7.6 - Compliance with Overall Outcomes of the Landscaping Code
Overall Outcomes Compliance
a) retains, reinforces and enhances the Complies.
natural landscape character of the site,
streetscape and locality; The current development does not
propose the establishment of additional
b) retains existing vegetation and other landscaping. Existing mature vegetation
natural features for their ecological, on the subject property provides sufficient
aesthetic and cultural values; screening to the proposed facility. The
proposed facility is also set back from
c) ensures the revegetation and existing dwellings and the road network in
rehabilitation of native wildlife habitat and order to reduce the visual dominance.
riparian zones to protect and enhance
ecological and biodiversity values; The provision of landscaping to screen the
facility is not considered to provide
d) facilitates water management including additional screening benefits beyond what
on-site detention and the efficient is provided by the existing vegetation on-
infiltration of stormwater; site and in the surrounding area.
Therefore, the proposal is considered to
e) enables the establishment of
have a minor impact on the natural
appropriate plantings that are of a scale
48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.