Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Cooran - Development Application

Attached to the e-mail Service & Utility Type 3 Tower (Telecommunications) -MCU18/0166.

of 156

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

a pre-clearing flora survey prior to confirming requirements under the NC Act
(as per Section 265 of the Nature Conservation (Wildlife Management)
Regulation 2006).

The subject site, under the DES flora survey trigger mapping, is not identified
within a ‘high risk’ area (refer Appendix D). Therefore, a pre-construction flora
survey will not be required under the NC Act.

7.9 Bushfire Assessment
Risk associated with bushfire hazards represents an important consideration for
siting and development decision making. The following design features apply to
the facility:

   •   The facility will not increase bushfire risk, given it doesn’t involve
       hazardous materials; does not emit undue heat, sparks or open flame;
   •   The tower has been designed to be resilient to bushfire damage;
   •   The proposed use will not increase the number of people living or working
       in the area, does not store hazardous materials, and will not increase the
       risk or impact of a bushfire;
   •   Power cabling will be run underground from the point of supply to the
       meter board and again to the equipment cabinet reducing the risk of
       weather damage that may cause malfunction;
   •   Cable trays will be enclosed in galvanised casing;
   •   The equipment cabinet and meter board are designed to resist ember
       penetration.

Considering the above, the proposed development on the subject property can
be undertaken while minimising the risk associated with bushfire hazards.


7.10 Endangered Species
In order to determine any possible Protected Species associated with the site an
EPBC report was obtained (refer to Appendix D). The EPBC Act Protected
Matters Report illustrates that some protected species are present within the 1
km radius search ring; however, the proposal for a Telecommunications Facility
is not considered an activity that will have a significant impact on any threatened
or migratory species in the area.


7.11 Social and Economic Impacts
Access to fast internet is an essential service in modern society. Initially, small
to medium business customers accounted for a significant part of the demand
for broadband technology, but internet services have now been embraced by
the general public. Usage of internet services continues to widen as new


                                                                                 63
Log in to download the original file

Cooran - Development Application.pdf · 12.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.