Original source · versioned page text
Cooran - Development Application
Attached to the e-mail Service & Utility Type 3 Tower (Telecommunications) -MCU18/0166.
The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Proposed nbn Telecommunications Facility on Lot 22 SP148684
Appendix C – Code Assessment
Specific Outcomes Probable Outcomes Compliance
and the lowest part of the floor of the appropriate stabilisation measures. Filling and
building does not exceed 3m. excavation will not result in land instability.
Roof form S14.1 With the exception of Industrial Not applicable.
O14 Roof forms— buildings, the main roof of the building
a) contribute positively to the local has a roof pitch no less than 5 degrees The proposed development does not involve a
skyline; and has minimum 600mm eaves to at building.
b) complement the low rise character least 75% of the perimeter of the
of the locality; building;
c) use simple traditional roof designs,
such as hipped, gabled and skillion; AND
and
d) do not create opportunities for S14.2 Buildings and structures do not
residents to overlook the private include rooftop terraces.
open space areas of neighbouring
properties.
Environment, Conservation and Recreation
Environment and cultural No solution provided. Complies.
heritage values
O15 There are no significant adverse It is acknowledged that some vegetation clearing is
effects on biodiversity, native required for the compound area, construction area
vegetation, native fauna habitat, and access track. The proposed facility has been
landscape quality, water quality or intentionally sited on a property which contains dense
cultural heritage values, including vegetation in order to utilise natural screening
those related to— benefits. To effectively integrate the facility with the
a) changes to natural drainage; natural environment, vegetation clearing is
necessary.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.