Original source · versioned page text
Cooran - Development Application
Attached to the e-mail Service & Utility Type 3 Tower (Telecommunications) -MCU18/0166.
The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Proposed nbn Telecommunications Facility on Lot 22 SP148684
Appendix C – Code Assessment
Specific Outcomes Probable Outcomes Compliance
b) disturbance of the remnant
vegetation or wetland However, clearing will be minimal as the proposed
systems; facility has been deliberately located in an area largely
c) management of landslide and cleared of mature vegetation. All clearing activities
fire risk; will be undertaken in accordance with nbn
d) erosion and the transport of construction management plans, including measures
sediments off site; to avoid impacts to fauna species, and vegetation
e) unmanaged public access; outside of the clearing footprint. All other vegetation
f) effluent disposal; on site will be maintained for screening purposes, and
g) changes to fauna habitat and clearing of vegetation will only be conducted where
behaviour; and necessary.
h) disturbance of buildings and
features, including natural The proposed compound will occupy a relatively
features of cultural heritage small, mostly pervious area (approximately 120 m2)
significance. and will not result in a significant increase in
stormwater runoff from the site, thereby protecting
the water quality of nearby watercourses and
streams. Furthermore, the proposed facility is non-
habitable and does not produce waste.
The proposed development is considered to be of a
low intensity, of non-urban nature and compatible
with the nature of the constraints present on the land.
The proposed development is designed and sited to
sensitively respond to the physical characteristics of
the site including steep land and fire hazard.
Being a non-sensitive use, the proposed development
is considered to be compatible with the level of risk
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.