Council archive · source document
07/2385 - MCU - Multiple Housing Type 2 - Duplex [As Published] · 132007.2385
INTEGRATED PLANNING ACT 1997
Removal of quarry material from a 8.
watercourse
For more information refer to Guide 16, schedule 8A
of the IPA & schedule 2 of the IP Regulation.
Ifyou answered “YES" to Q8, the application
Tequires assessment by NR&M. If an agency other
than NR&M is the assessment manager for the
application, NR&M is a concurrence agency for the
application in relation to this matter.
Note: Part G of Form 1 is required to be completed
as the activity of removing quarry material from a
watercourse is also an Environmentally Relevant
Activity (ERA).
Referrals Checklist, Version 12.0, 8 April 2005
Does the application involve development for the removal of quarry material from a watercourse?
under an allocation notice given under the Water Act 2000?
I) NO
LJ YES - complete Part K; and G of Form 1
Operational works in atidal areaor |9.
coastal management district
For more information refer to Guide 18, schedule 8A
of the IPA & schedule 2 of the IP Requlation,
lf you answered “YES" to Q9, the application
requires assessment by EPA. If an agency other
than EPA is the assessment manager for the
application, EPA is a concurrence agency for the
application in relation to this matter.
Does the application involve operational works in a tidal area or coastal management district as
defined under the Coastal Protection and Management Act 1995?
EJ NO
(11 YES - complete Part M of Form 1
Tidal works and coastal management | 10.
For more information refer to Guide 18, schedule 8A
of the IPA & schedule 2 of the IP Requlation.
Untess you answered “none of the above’, the
application triggers referral to QT'(Maritime Safety
@ Qld) as concurrence agency.
The application involves operational work that is: (tick the applicable box/es)
C1 (i) | tidal work"! - complete Part M of Form 1
C1 (ii) disposing of dredge spoil or other solid material in tidal water - complete Part M of Form 1
UO (ii) reclaiming land under tidal water - complete Part M of Form 1
O (iv) constructing a canal’ if the canal is associated with reconfiguring a lot - complete Part M of
Form t
{J (v) none of the above.
Coastal management 11.
For more information refer to Guide 18, schedule 8A
of the 1PA & schedule 2 of the IP Regulation.
Unless you answered “none of the above’, the
application requires assessment by EPA. If an
agency other than EPA is the assessment manager
for the application, EPA is a concurrence agency for
the application in relation to this matter.
The application involves: (tick the applicable box/es)
(i) a material change of use involving operational work carried out completely or partly
in a coastal management district’? and assessable under a planning scheme
(C1 (ii) a material change of use involving building work carried out completely or partly in a
coastal management district and assessable under a planning scheme that is -
« the construction of a new premises with a GFA" of at least 1000m?
« the enlargement of the GFA of an existing premises by more than 1000m?
Dil) assessable reconfiguration of a lot where the land is situated completely or partly in a
coastal management district
Cv) assessable reconfiguration of a lot's in connection with the construction of a canal -
complete Part M of Form 1
Bd (v) none of the above
Development below high water mark | 12.
For more information refer to Guide 18, schedule 84
of the [PA & schedule 2 of the IP Requlation.
If you answered “YES" to Q12, the application
triggers referral to the Port Authority.
The Port Authority is concurrence agency if the
development is -
In all other situation the Port Authority is advice
agency.
within 200m of a shipping channet or an entry
and exit shipping corridor for the port
within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;
within 1000m of a planned port facility identified
in a {and use plan approved under the Transport
infrastructure Act 1994,
Does the application involve development below high water mark’® and within the limits of a port
under the Transport Infrastructure Act 1994?
{4 NO
LI YES - complete Part M of Form 1
Marinas 13.
For more information refer to Guide 18, schedule 8A
of the IPA & schedule 2 of the IP Regulation.
Ifyou answered “YES” to 013, the application
triggers referral to Queensland Fire and Rescue
Service as an advice agency.
Does the application involve operational work that is tidal work for a marina’ with more than 6
vessel berths?
ENO
(YES - complete Part M of Form 1
Watercourse is defined in sch 10 of the IPA
Queensland Transport
Tidat work is defined in sch 10 of the IPA
Canal means canal as defined under the Coastal Protection and Management Act 1995
Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act
GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
Under 5117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.
High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide
Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2385 - MCU - Multiple Housing Type 2 - Duplex [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.