Skip to the record
Every meeting, every word.

Council archive · source document

07/2385 - MCU - Multiple Housing Type 2 - Duplex [As Published] · 132007.2385

of 34

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

Tidal works in strategic port land tidal
areas

For more information refer to Guide 18, schedule 8A
of the IPA & schedule 2 of the IP Regulation.

ifyou answered "YES" to Q14, the relevant port
authority is the assessment manager for the
application and EPA and Queensland Transport are
concurrence agencies for the application.

Heritage

For further information refer to Guide 19, schedute
&A of the IPA & schedule 2 of the !P Regulation.
Ifyou answered “YES” to Q15, the application
triggers referral to the Queensland Heritage Council
as concurrence agency for the application.

 

15.

Referrals Checklist, Version 12.0, 8 April 2005,
Does the application involve tidal works within the limits of strategic port land tidal areas"8?
NO
(11 YES - complete Part M of Form 1

Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?

NO
(YES - complete Part C of Form 1

 

Declared catchment areas

For more information, including a list of the declared
catchment areas within Queenstand, refer to Guide
13, schedule 8A of the IPA & schedule 2 of the IP
Regulation.

Unless you answered ‘none of the above’, the
application requires assessment by NR&M, If an
agency other than NR&M is the assessment
manager for the application, NR&M is a concurrence
agency for the application in relation to this matter.

16.

 

The application involves development in an areas declared to be a catchment area under the

Water Act 2000 for: (tick the applicable box/es)

(1 (i) reconfiguration of a lot, if any lot resulting from the reconfiguration is less than 16
hectares;

O (ii) the establishment or expansion of a waste water disposal system, other than a disposal
system for carrying out an environmentally relevant activity under the Environmental
Protection Act 1994

(iii) none of the above

 

Contaminated land

Applications involving material change of use and /
or reconfiguring a lot may trigger this referral.

For more information refer to Guide 5, schedule 8A
of the [PA & schedule 2 of the IP Requlation.

lf you answered “YES” to Qt7, the application
requires assessment by EPA. If an agency other
than EPA is the assessment manager for the
application, EPA will be a concurrence agency for
the application in relation to this matter.

Electricity infrastructure

For more information refer to schedule 2of the [P
Regulation.

Unless you answered "none of the above’, the
application triggers referral to the agency to which
the easement is granted in favour of as advice
agency.

 

17.

18.

This application involves: (tick the applicable boxes) —
C (a) reconfiguring a fot for which all of part of the premises are —
(i) premises mentioned in the IPA, schedule 8, part 1, table 2 -
« item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exemption otherwise provided for by paragraph (e); or
« item 7,
¢ including the exemption otherwise provided for a mining activity or petroleum activity;
or
in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
C (b) a material change of use -
{i) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(ii) _ if all or part of the premises is in an area for which an area management advice has
been given for unexploded ordnance - complete Part N of Form 1
EI (©) none of the above

(ii)

The application involves: (tick the applicable box/es)
(1 (i) reconfiguration of a lot where any part of the lot is -
« subject to an easement in favour of a distribution entity or transmission entity under the

Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or

« situated within 100m of a substation site;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if -

any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

* any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if any part of the premises is situated within 100m of a substation

site

operational work that is filling or excavation, not associated with reconfiguring a lot, if -

« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994; and

e the work is located wholly or partly in the easement

XX] (v)_ none of the above.

Oitii

D iii

Ot)

18 Strategic port land tidal areas are the areas generally 50 meters seaward of high water mark adjacent to strategic port land.

Used in these records

About this file

File size
5.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2385 - MCU - Multiple Housing Type 2 - Duplex [As Published].pdf · 5.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.