Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Information Request OPW26 0033 [As Published]

of 8
                 Information Required
                 2.     Investigate and provide amended plans that relocates the proposed pedestrian kerb
                        ramp to support connectivity to the southern side of Red Street.


                 Item – Upgrade of Red/Pottery Street Intersection
                 Council’s Infrastructure Services department have requested that the alignment of the
                 proposed kerb and channel at the northern tangent point on Red Street align with the existing
                 kerb and channel fronting 4 Red Street (5RP814922).
                 Additionally, it is unclear how concentrated flows from the proposed kerb and channel will be
                 released back into the existing table drain in Red Street.
                 Refer to the below extracts.




                                                                                                      Page 2 of 8
Document Set ID: 24593729
Version: 2, Version Date: 12/03/2026

Log in to download the original (Information Request OPW26 0033 [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.