Information Request OPW26 0033 [As Published]
Issue – Bioretention Basin
The proposed bioretention basin includes rock armouring of the inlet in lieu of a sediment
forebay.
A maintenance access driveway to the maintenance ramp has not been provided.
Information Required
6. Provide amended plans that includes a bioretention basin with a sediment forebay and
the provision for a maintenance driveway.
6.1. The forebay must be accessible for maintenance purposes and be designed in
accordance with Water by Design’s guidelines.
6.2. The maintenance driveway must be concreted and include a lockable bollard to
prevent non-authorised vehicles from entering the maintenance driveway.
Issue – Drainage Easements
The submitted engineering plans does not detail the inter-allotment drainage easements
pursuant to conditions 12 and 16 of the Higher Order Approval (RAL19/0014) –
notwithstanding the future lot numbers have changed.
Information Required
7. Provide amended plans that details the extent of the inter-allotment drainage easement
pursuant to conditions 12 and 16 of the Higher Order Approval (RAL19/0014).
Issue – Stormwater Management
Insufficient information has been provided to demonstrate compliance with conditions 37 and
38 of the Higher Order Approval (RAL19/0014).
Additionally, proposed structures “6/A”, “7/A” and “8/A” are surcharge pits – which contradicts
condition 37(c) of the Higher Order Approval.
Information Required
8. Provide a Stormwater Management Plan that satisfies the requirements of conditions 37
and 38 of the Higher Order Approval (RAL19/0014). The SWMP must be prepared by a
suitably qualified person (RPEQ).
9. Provide amended plans that includes gravity stormwater drainage structures in lieu of
surcharging pits.
Issue – External Works
Condition 6 of the Higher Order Approval (RAL19/0014) seeks that the development provide
kerb and channel and a footpath for the full length of the site’s frontage to Pottery Street.
The engineering plans does not include a footpath and kerb and channel for the full length of
the site’s frontage to Pottery Street.
Refer to the below extracts.
Page 4 of 8
Document Set ID: 24593729
Version: 2, Version Date: 12/03/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Information Request OPW26 0033 [As Published].pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.