Original source · versioned page text
Information Request OPW26 0033 [As Published]
Information Required
10. Provide amended plans that includes a 1.5m wide footpath and kerb and channel for the
full length of the site’s frontage to Pottery Street. The southern leg of future kerb and
channel must be generally consistent with the existing road alignment.
Note: Council recognise that an opportunity may exist to remove “5/A” and redesign
“6/A” as a kerb inlet pit to capture flows for the requested kerb and channel.
Page 5 of 8
Document Set ID: 24593729
Version: 2, Version Date: 12/03/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Information Request OPW26 0033 [As Published].pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.