Skip to the record
Search everything, all in one place.

Original source · versioned page text

Information Request OPW26 0033 [As Published]

of 8
                 Information Required
                 10.    Provide amended plans that includes a 1.5m wide footpath and kerb and channel for the
                        full length of the site’s frontage to Pottery Street. The southern leg of future kerb and
                        channel must be generally consistent with the existing road alignment.
                        Note: Council recognise that an opportunity may exist to remove “5/A” and redesign
                        “6/A” as a kerb inlet pit to capture flows for the requested kerb and channel.




                                                                                                         Page 5 of 8
Document Set ID: 24593729
Version: 2, Version Date: 12/03/2026

Log in to download the original (Information Request OPW26 0033 [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.