Original source · versioned page text
7. Volume 4 - Traffic Impac Assessment
Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Traffic Impact Assessment & Stormwater Management Plan (email 3 of 3).
LAMBERT & REHBEIN ENGINEERS MANAGERS SCIENTISTS [OCR of page images] 4 £0.40 OY Oe ia 1.37 4.10 0.1 19m B—Double KWeters Tractor Width : Lock to Lock Time Trailer Width 22! Steering Angle Tractor Track 22! Articulating Angle Trailer Track “= DENMAC NOMINEES PTY LTD Cpe im 10-142 EUMUNDI — NOOSA RAD Ti «srs [B16239-SK-005 SCALE 1:125 (A1) ‘ VEHICLE SWEPT PATH ASSESSMENT B76 Vccate, aS SHOWN [AT NOOSAVILLE, QLD 4566 19m B-DOUBLE VEHICLE Fe oa [Fle ete BELOW |e F:\Jobs\816200\B16239\ Drawings \Traffic\816239-SK-005.dug
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.