Original source · versioned page text
7. Volume 4 - Traffic Impac Assessment
Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Traffic Impact Assessment & Stormwater Management Plan (email 3 of 3).
LAMBERT & REHBEIN ENGINEERS MANAGERS SCIENTISTS [OCR of page images] 12.5m_HRV_INGRES Ae Do OQfo 2.40 6.60 HRV meters Width : 2.50 Track : 2.50 Lock to Lock Time : 6.0 Steering Angle : 35.2 F P 2.40 6.60 HRV Width Track OKO Sy meters OF : 2.50 : 2.50 Lock to Lock Time : 6.0 Steering Angle 1 35.2 v 0 12 3 4 Sm (cilia! SCALE 1:125 (A1) on B B/I/16 A syrsi6. | Seale_AS_ SHOWN Al HEAVY RIGID VEHICLE Approved __TG Rev. Date | file Refi SEE BELOW [sr F)\Jobs\(816200\\B16239 Drawings Traffic\B16239-SK—006.dwg 140-142 EUMUNDI - NOOSA RAOD, NOOSAVILLE, QLD 4566 Client: DENMAC NOMINEES PTY LTD Title: VEHICLE SWEPT PATH ASSESSMENT (h LAMBERT & REHBEIN ENGINEERS, SCIENTISTS Figure No B16239-SK-006
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.