Original source · versioned page text
7. Volume 4 - Traffic Impac Assessment
Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Traffic Impact Assessment & Stormwater Management Plan (email 3 of 3).
SPECIFIC OUTCOMES PROBABLE SOLUTIONS RESPONSE
apparatus
O22 Site layout and building design S22.1 Below ground components of Refer to Civil Engineering Report.
provides for soft landscaping to be buildings, including car parks, do
established. not extend beyond the above
ground footprint to allow for the
provision of landscaping, particularly
within building setbacks
Education Types 1, 2 or 3
O23 Carparking and setdown areas S23.1 Paved setdown areas are NA
are designed and located to provided within the site;
facilitate their safe and efficient use.
AND
S23.2 For a minimum of 50% of
carparking spaces, pedestrian
access to buildings is not across or
through driveways, carparks,
setdown or manoeuvring areas;
AND
S23.3 Carparking and setdown
areas are visible from off-site.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.