Original source · versioned page text
RFI - Attachment 3 - Stormwater Management Plan
Original PDF page 11, section 1. The text section number identifies this passage in the reader.
FLOOD CONSIDERATIONS As noted above, review of the Noosa Shire Council Intramaps flood layers including the Flood Hazards Overlay has identified that the site is located outside of the flood inundation zone, however the proposed access along Carpenters Road is subject to inundation as shown below in Figure 3.1 – Flood hazard Overlay Map (Noosa Shire Council Intramaps, 2022). Figure 3.1 – Flood hazard Overlay Map (Noosa Shire Council Intramaps, 2022) Flood protection measures are required to ensure the site can be safely accessed in all storm events up to and including 1% AEP storm event (as discussed below, refer Section 3.2). This will involve an upgrade of Carpenters Road to achieve the required level of flood immunity. Modelling of the existing and proposed developed access road has been undertaken to ensure that the proposed upgrade will not result in negative impacts to the upstream or downstream properties along the drainage feature. Project number 21020 Page 11 of 36 File RECOR Concept Stormwater Management Report - 21020.docx, 2022-09-05 Revision 0 P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - Attachment 3 - Stormwater Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.