Original source · versioned page text
RFI - Attachment 3 - Stormwater Management Plan
Original PDF page 21, section 1. The text section number identifies this passage in the reader.
Figure 4.4 - Ecosol Litter Basket Pollutant Removal Efficiencies
4.1.1.3. Bioretention Areas
An end of line bioretention area will provide treatment to all stormwater runoff captured within the internal
drainage network before it is discharged from the development. The bioretention areas are modelled in
accordance with the Water by Design MUSIC Guidelines 2018 with the node configuration shown below in Figure
4.5 – Bioretention Node details.
Figure 4.5 – Bioretention Node details
Table 4.3 – Indicative Bioretention Area Plantings below based on the Brisbane City Council Water Sensitive Urban
Design Engineering Guidelines presents a sample of suitable plants that may be used to provide effective removal
of nutrients in the areas however a landscaping specialist should be consulted to confirm final species to be
planted.
Table 4.3 – Indicative Bioretention Area Plantings
Project number 21020 Page 21 of 36
File RECOR Concept Stormwater Management Report - 21020.docx, 2022-09-05
Revision 0
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - Attachment 3 - Stormwater Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.