Original source · versioned page text
RFI - Attachment 3 - Stormwater Management Plan
Original PDF page 33, section 1. The text section number identifies this passage in the reader.
N LEGEND
EXISTING SEWER INSPECTION OPENING
EXISTING SEWER CHAMBER
EXISTING ELECTRICITY SERVICE PILLAR
10
3
113 EXISTING WATER METER
EXISTING FIRE HYDRANT
SW
3
11
ALL EXISTING TREES TO REMAIN U.N.O.
EXISTING POWER POLE
105
EXISTING 'LIVE' SEWER CHAMBER
108
SW
S EXISTING SEWERAGE LINE
S SEWERAGE LINE PROPOSED BY RAL-2011-1198
W EXISTING WATER MAINS
SW
E UNDERGROUND ELECTRICITY
S
E ELECTRICITY
W
SW STORMWATER PIPE
103
S
SW
110
WATER VALVE
S
W
STORMWATER HEADWALL
S
SW
S
EXISTING BUILDINGS, STRUCTURES AND
IMPERVIOUS SURFACES TO BE
SW
DEMOLISHED AND REMOVED OFF SITE
SW
SW
S
W
S
SW
S
W
SW
S
105
SW NOTES
8
10
SW
1. FOR GENERAL NOTES REFER DWG 002, WHICH IS TO BE
W
REQUESTED AND VIEWED PRIOR TO COMMENCEMENT OF
S
CONSTRUCTION IF NOT SUPPLIED.
2. THE CONTRACTOR WILL MAKE HIMSELF FULLY AWARE OF
S
W
THE EXISTING FEATURES OF THIS SITE AND ENSURE ANY
S
S ADDITIONAL WORKS NOT SHOWN ON THIS PLAN ARE
SW
INCLUDED IN THE CONTRACT.
S
S
W
S 3. LOCATION AND DEPTH OF EXISTING SERVICES BASED ON
S
SW
SURVEY, DBYD AND COUNCIL RECORDS. IT IS THE
110
SW
CONTRACTORS RESPONSIBILITY TO CONFIRM ACTUAL
S
LOCATION AND DEPTH PRIOR TO CARRYING OUT ANY
EXCAVATION OR TRENCHING WORKS.
SW
S
4. CONTRACTOR TO LOCATE AND PROTECT ALL EXISTING
SW
SERVICES ON SITE PRIOR TO COMMENCEMENT OF WORKS.
5. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS
PRIOR TO ANY DEMOLITION WORKS COMMENCING ON SITE.
S
SW
6. ALL VEGETATION WITHIN THE LIMIT OF WORKS TO BE
W
SW
S
CLEARED, MULCHED AND REMOVED FROM SITE IN
ACCORDANCE WITH APPROVED VEGETATION CLEARING
S
PLAN (BY OTHERS) OR IF SCHEDULED STOCKPILE FOR USE
10
5
W
105
SW
SW BY LANDSCAPER.
S
W
W 7. CONTRACTOR TO LOCATE ALL EXISTING UTILITIES ON SITE
W S W
AND MAKE SUITABLE ARRANGEMENTS TO HAVE
S
W
DISCONNECTED PRIOR TO DEMOLITION WORKS BEGINNING.
W
SW
8. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS
S
DETAILED ON THIS DRAWING, THE CONTRACTOR IS TO
NOTIFY RECOR AND RECEIVE WRITTEN CONFIRMATION THAT
S
W
SW
108 WORKS CAN COMMENCE.
9. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR
ADJOINING PROPERTIES AND COUNCIL ROADS AND VERGES
PRIOR TO COMMENCEMENT OF ANY WORKS ON SITE.
S
W
10. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING
108
S
STRUCTURES, ROADS AND SERVICES WITHIN LIMIT OF
SW
S WORKS AND REMOVE FROM SITE U.N.O.
S
11. WHERE NECESSARY, CONTRACTOR SHALL OBTAIN ALL
S
NECESSARY APPROVALS TO CARRY OUT SERVICES
W
RELOCATION OR ALTERATIONS.
SW
S
S
CLIENT DETAILS: PROJECT ADDRESS: APPROVED BY: PROJECT NAME:
PROPOSED SOCIAL HOUSING DEVELOPMENT
W
TITLE: STATUS:
S
55 CARPENTERS ROAD EXISTING SERVICES AND FOR APPROVAL - NOT FOR
© ABN 89 647 469 707
COOROY, QLD, 4563 JARO BAULEKA DEMOLITION LAYOUT PLAN CONSTRUCTION
W
75 NOOSA DRIVE RPEQ: 20693
01 05/09/22 FOR APPROVAL ISSUE JAC MVP JB SCALE:
NOOSA HEADS, QLD 4567 S CPEng
+61 7 5211 1003 REV DATE DESCRIPTION DWN CHK APP
1:1000 DATE: 05/09/22
DRAWING NUMBER: PROJECT NUMBER: SHEET REV:
SIZE:
RECORCONSULTING.COM REVISIONS S IF IN DOUBT ASK
DO NOT SCALE,
003 21020 A1 01
W
S
S
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - Attachment 3 - Stormwater Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.