RFI - Attachment 3 - Stormwater Management Plan
Original PDF page 34, section 1. The text section number identifies this passage in the reader.
LEGEND
105
N
SW
103
W PROPOSED STORMWATER DRAINAGE
580.000
590.000
1
.000
S
A-
0800
S
1.0
11.9m 4.2%
Ø525 570
600
612L/s
0
0
.00
0
601L/s
0.0
2)
560
31.7m .1 4.2% 7)
PROPOSED FIELD INLET PIT
61
6
0
(2Ø450 2.
.00
0
00
3 1.9 L/s 0(
2 .1 /s
0.0
550
-
A u= 29 /s A- u=2 17L /s
W
K c= 29L /s
62
K c= 17L /s
00
00
Q a= 9L s
0.0
Q i=2 0L/ Q a= 7L s
0.0
Q i=1 0L/
54
Q b=
63
Q Q b=
00
00
PROPOSED HEADWALL
/s Q
0.0
0.0
4L %
56 3.7
53
S
64
.7m 0
SW
00
62 Ø45
00
0.0
0.0
SW
65
SW
09
52
SW
6.8
65
00
0.0
PROPOSED BIORETENTION GARDEN
51
)
39
2.
SW
0
9( s 00
S
/s 9 0.
5L % 4 .
A- u=1 19L /s
/ 50
14 3.6
W
.4m 5 K c= 19L /s
19 Ø37 Q a= 9L s
) Q i=1 0L/
22
S
1. Q b=
7(
W
Q 0
1 1.1 L/s .00
412L .0%
/s -
B u= 35 /s 490
6L %
23.5m450
11 3.6 K c= 35L /s
/s
1
. 9 m 75 Q a= 5L s
Ø
22 Ø3 Q i=3 0L/
113
Q b=
Q
DRAINAGE NOTES
S
) .000
2 65 480
2 .4 /s 1.
B- u=1 39L /s 4(
5 .4
W
K c= 39L /s A- u=1 6L/s s
L/s % Q a= 9L s 2K6 c=6 6L/ s
84 3.2
S
Q i=3 0L/ .0 a8=L L/ /s
Q
.3m 75 Q b= m 6
Ø Q Q1i=/s =0L
0 0
32 Ø3 70.0
S
Q 4
20.3m 3.7%
37 .0 b
W
5 Q%
358L/s
1. REFER HYDRAULIC DRAWINGS FOR BUILDING DRAINAGE DETAILS.
Ø375
)
67 00
2. ) 0.0
6( 46
0
63
11
2. ALL ROADWORKS AND DRAINAGE (EXTERNAL TO SITE BOUNDARIES
3 2.6 L/s 1.
S
-
B u= 54 /s ) 3(
K c= 54L /s 24 - 1 1.3 L/s
2.
0
Q a= 4L s 4( D u= 15 /s
00
L/s % Q i=5 0L/ 6 .9 /s K c= 15L /s
0.
36 1.0 A- u=1 50L /s
AND/OR COUNCIL OWNED DRAINAGE PIPES INTERNAL TO THE SITE
45
Q b= Q a= 5L s
.4m 375 Q K c= 50L /s Q i=1 0L/
7
W
3 Ø Q a= 0L s Q b=
0
Q i=5 0L/
S
/s %
BOUNDARIES) CONSTRUCTION AND TESTING TO BE IN ACCORDANCE
Q
00
7L .6
0.
Q b=
31 m 3 5
44
Q
S
. 37
62 1.0%
3
31 Ø
W
.8m 5
WITH NOOSA SHIRE COUNCIL DEVELOPMENT GUIDELINES, DRAWINGS
29 Ø37
0
L/s
00
0
SW
0.
4 .0 /s
S
43
B- u=7 42L /s
K c= 42L /s )
SW
Q a= 2L s 2.
47
AND SPECIFICATIONS.
0
Q i=4 0L/ 3( s
SW
00
1 )
. 00
0.
7 /
Q b= A- u=2 52L /s 3. S
42
9(
3. ALL DRAINAGE CONSTRUCTION (PRIVATELY OWNED DRAINAGE LINES
Q /s K c= 52L /s
3L % 2 .6 /s
10 3.0 Q a= 2L s
L/s % D- u=2 35L /s
.4m 75 Q i=5 0L/ K c= 35L /s S
0
25 3.8
W
00
9L %
29 Ø3 Q b=
.7m 375
0.
Q a= 5L s
INTERNAL TO THE SITE BOUNDARIES) CONSTRUCTED AND TESTED TO
16 1. 0
.3m 375
41
Q Q i=3 0L/
/s
) 3
2 Ø
1 Ø
) 03 Q b=
97 2.
1. 7( Q
SW
5
0
BE IN ACCORDANCE WITH RELEVANT AUSTRALIAN STANDARDS.
SW
S
7( - 1 1.6 L/s 0.
00
8 1.6 L/s C u= 59 /s 0
69L/s.0% -
K c= 59L /s 3 .0 /s 40
m1
A u= 39 /s
K c= 39L /s Q a= 9L s D- u=7 30L /s
36.2 375 Q i=5 0L/ K c= 30L /s
4. ALL STORMWATER DRAINAGE PIPES INTERNAL TO SITE SHALL BE: Ø225
Ø Q a= 9L s Q a= 0L s
Q i=3 0L/
3.9%
Q b= Q i=3 0L/
S
) Q b= Q 00
S
02
18.3m 5
118L/s
Q b= 0.0
2.
Ø37
40L/s Q Q 39
3( s
1.0%
37.9m 5
Ø37
9 . 8
A- u=1 35L /s
K c= 35L /s
Q a= 5L s
/
2.
74
) S RRJ RCP OR APPROVED EQUIVALENT.
0
10 .0 /s
A- u=7 46L /s
K c= 46L /s
Q i=3 0L/
Q b=
Q
5(
2 .4 /s
C- u=2 18L /s
K c= 18L See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - Attachment 3 - Stormwater Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.