Original source · versioned page text
RFI - Attachment 3 - Stormwater Management Plan
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
INTRODUCTION
RECOR has been engaged to prepare a Stormwater Management Report to accompany a development application
for an affordable housing development located at Lot 2 RP 200519 (55 Carpenters Road, Cooroy), which is located
in the Noosa Shire Council local government area. The proposed development will result in 33 sites containing 1
and 2 bedroom relocatable cabin dwellings with an existing dwelling on the site also retained.
This report investigates the stormwater management considerations for the proposed development site and
assesses how the run-off from the site is to be managed in accordance with Noosa Shire Council requirements for
stormwater drainage.
This document has been prepared with consideration for the following specifications, guidelines and reports:
• Noosa Plan 2020
• Water Sensitive Urban Design Technical Guidelines for Southeast Queensland
• State Planning Policy 2017
• Queensland Urban Drainage Manual (QUDM)
• International Erosion Control Association (IECA) Best Practice Erosion and Sediment Control document
Project number 21020 Page 4 of 36
File RECOR Concept Stormwater Management Report - 21020.docx, 2022-09-05
Revision 0
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - Attachment 3 - Stormwater Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.