Skip to the record
Search everything, all in one place.

Original source · versioned page text

2019-11-12 Services & Organisation Committee Agenda

of 129

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 84 of 129

Report run date: 29-Oct-2019 07:40:39

    500636         500622 - Noosa Heads Noosa Parade Road Corridor Upgrade - Design                          0                0                    0                   0                0            2,709            5,[email protected]%
    500671         500671 - Noosa Heads, Park Road Boardwalk Construction                                    0                0                    0                   0                0          47,784            19,[email protected]%
    500906         500903 - Tewantin, Hilton Terrace CNLGGP Shared Pathway                                   0           18,074                    0                   0            4,929            2,719                00        15.05%
    500923         500919 - Wallace Park Pathway 5&6                                                         0           14,609                    0                   0           3,984                0                 08         0.00%
    500984         500956 - Shire Pathway Renewal Program FY19/20                                      100,000          100,000                    0                   0           27,273           19,621                00        19.62%
    500994         500967 - Noosaville Sea Eagle Drive & Shire Drive Pathway Upgrades                  174,000          174,000                    0                   0          174,000               0                 00         0.00%
                                                                  Total Pathways & Boardwalks          274,000          306,683                   0                    0          210,186          72,833            25,573         23.75%

    100726         100726 - Peregian Beach Public Amenities Renewal                                    577,000          594,215                    0                   0          406,868          170,129          406,[email protected]%
                                                                         Total Public Amenities        577,000          594,215                   0                    0         406,868          170,129          406,143          28.63%

    500312         500957 - Shire Bus Shelter Disabled Compliant Program Annual                        500,000          500,000                    0                   0          166,667          52,280           273,[email protected]%
                                                           Total Public Transport Infrastructure      500,000          500,000                    0                    0          166,667           52,280          273,254         10.46%

    500840         500757 - Black Mountain - Road Priority Sections and Road Reconstruct              1,290,000       1,318,214                    0                   0           41,909           14,754            7,[email protected]%
    500967         500936 - Directional Signage Walter Hay Dr Roundabouts and Reef St                        0          26,533                    ie}                  0            7,236             173                 00         0.65%
    500986         500958 - Shire Kerb & Channel Renewal Program Annual                                100,000          100,000                    0                   0          27,273                0                 08         0.00%
    500901         500959 - Shire Reseal & Rehabilitation Renewal Program Annual                      3,600,000       3,600,000                    0                   0        1,300,167        2,310,433        1,533,[email protected]%
    500996         500969 - Boreen Point, Tewah St Gravel Road Seal                                    250,000          250,000                    0                   0          250,000               0                 00         0.00%
    500997         500970 - Boreen Point, Hector Street Road Widening and Kerb & Channel                97,000           97,000                    0                   0          26,455             4,492                [email protected]%
    500998         500971 - Pomona, Ambulance Street Sealing of Gravel Section                         200,000          200,000                    0                   0                0            3,342                00         1.67%
    501014         500982 - Tewantin Beckmans Rd Bypass Forward Design                                       0           50,000                    0                   0           13,636            2,086                00         417%
                                                                   Total Sealed Roads Network         5,537,000       5,641,747                   0                    0        1,666,675        2,335,279        1,541,340          #REF!

    500919         500915 - Swan Avenue Drainage                                                             0          20,000                     0                   0           5,455            12,587           32,[email protected]%
    500920         500916 - Gympie Terrace Stormwater                                                 1,200,000       1,184,831                    0                   0           74,420          27,331             6,[email protected]%
    500942         500927 - Stormwater Backflow Vulnerability Assessment                                     0            5,287                    0                   0            1,442               0                 00         0.00%
    500954         500937 - GPT Liner Net Replacement                                                        0           15,000                    0                   0           15,000           14,965                08        99.77%
    500988         500960 - Shire Bioretention Basin Renewals Program Annual                            80,000           80,000                    0                   0          26,667             1,265                ny)        1.58%
    500989         500961 - Shire Pit Structure Renewal Program Annual                                 150,000          150,000                    0                   0           40,909           19,427           31,[email protected]%
    500999         500972 - Noosaville, Project Ave Stormwater Drainage Easement Upgrade               250,000          250,000                    0                   0            4,042          22,774             6,[email protected]%
                                                                     Total Stormwater Drainage        1,680,000       1,705,118                   0                    0          167,935          98,349            77,033          5.77%

                                                                                                                                                                                                               Page 84 of 129
Log in to download the original file

2019-11-12 Services & Organisation Committee Agenda(PDF, 11MB).pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.