SUPERSEDED Decision Notice - Change to an Existing Approval [As Published] · 132003.220660.3
2003/220660
Carparking
11. A minimum of three (3) covered carpark spaces shall be provided on site.
12. The carparking area shall be designed to comply with the provisions of AS 2890.1-1993 for
user class 1 with a minimum head clearance (headroom) at any point of 2.2m.
13. All carparking shall be kept, maintained and line-marked in a condition fit for use.
Roadworks Contributions
14. A roadworks contribution of $2,672 towards the Coastal Major Road Network shall be paid to
the Council prior to obtaining a Development Permit for Operational Works. This amount will
be subject to variations in the Price Index, All Groups Brisbane from March 2003 until the date
of payment.
Stormwater Drainage
15. Roof and surface water is to be collected on site and is to be discharged into the existing inter
allotment discharge pipe located adjacent to southern property boundary.
16. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
17. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
18. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
Service Easements
19. A minimum setback of 2.1 metres shall be maintained from the private sewer in accordance
with the requirements of the Building Units and Group Titles Act, 1980.
Earthworks
20. A Registered Professional Engineer Queensland shall certify all retaining wall and deep
footing designs and certify that he or she has supervised all engineering works an that all
works have been completed in accordance with the relevant Australian Standards and the
Morrison Geotechnic report dated 7th April 2003 and best engineering practice.
21. The site will require the design of a soil retaining system by a Structural Engineer. Clearance
shall be obtained from Council’s Manager of Building as part of the process of obtaining a
Development Permit for Building works.
22. A Geotechnical engineer must be on site to supervise and direct all excavations works and
foundation constructions (i.e. Level 1 supervision in accordance with AS 3798-1996). Such
work shall only be carried out during dry weather conditions. Should any risk of sand
movement occur - all work shall be suspended until steps (approved by the Geotechnical
Engineer in conjunction with Council’s Manager Building Services) have been taken to ensure
that no further slippage will result.
23. Filling works required on site shall be carried out in accordance with Section 3.8 of Council’s
Engineering Design Standards Manual and so as not to cause the ponding of water on any
adjoining lands or the blockage of, or interference with, any natural watercourses.
This will require the design and construction of drainage pipes within the development site that
cater for drainage within the adjoining sites and in this regard a Development Permit for
Operational Works shall be obtained.
Page 3 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
001AC754.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 58 KB (small file)
- File type
No other editions are linked here.