Original source · versioned page text
12. Code Assessment
Performance outcomes Acceptable outcomes Comment
Safety of people and property
PO1 AO1.1 AO1.1 – Performance outcome
Development maintains the safety of Development which will materially increase the number of
The proposed development is mainly sited within the
people and property from the adverse people living or congregating on premises,
including reconfiguring a lot, is not located within a medium potential impact buffer area which adjoins the High
impacts of bushfire.
or high bushfire hazard area. potential bushfire intensity mapping situated toward
the rear of the site.
AO1.2
Development maximises setbacks from However, the proposed extension to the hospice has
hazardous vegetation to achieve an acceptable risk. adequate water supply, alternative energy supply and
a detailed Bushfire Management Plan, Bushfire
Editor’s Note — PSP8 Natural Hazards provides guidance survival plan and Emergency evacuation plan (refer to
for assessing bushfire hazard risk and preparing a bushfire Appendix C, D & E) which will ensure that the safety
hazard management plan. of people and property will be maintained in the
event of a bushfire.
Impacts on Ecologically Important Areas
PO2 PO2 – Complies
Bushfire mitigation measures do not No acceptable outcome provided No bushfire mitigation measures are proposed that
adversely impact on: will disturb or adversely impact nearby areas of
native vegetation, biodiversity values or the long
term integrity of adjoining waterways, wetlands and
1. biodiversity values,
vegetation.
connectivity and ecosystem
functioning; and
2. the long term physical
integrity of
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original