Original source · versioned page text
12. Code Assessment
Existing Services Code
Performance outcomes Acceptable Outcomes Comment
Assessable development
Complies
PO1 No acceptable outcome provided
Development near a stormwater drain, overland
Buildings and structures will not be located near any
flow path or associated structure does not—
stormwater drain or overland flow path and as such
will not adversely impact on any existing stormwater
1. adversely affect the function of the
infrastructure or overland flow paths.
service;
2. place an additional load on the
service; and
3. unduly increase future maintenance
costs.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original