Original source · versioned page text
12. Code Assessment
Performance outcomes Acceptable Outcomes Comment
PO2 AO2.1
Maintenance access is provided to all stormwater For trunk infrastructure, a registered easement in Not applicable
drains, overland flow paths and associated favour of Council is created over all underground
structures. infrastructure located in private property.
AO2.2
The width of the easement required is in Not applicable
accordance with Council’s Planning Scheme Policy
PSP6 Engineering Design Standards – Roads,
drainage and earthworks.
AO2.3
The easement is centred over the centreline of the Not applicable
infrastructure.
You have reached the end of the page.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original