ACTIVITY SERVICE LEVEL TARGET
Stormwater system maintenance & operations
[Includes inspections and routine maintenance/repairs of culverts, pipes, inlet pits & outlets, subsoil drains, open
channels, retardation basins, retention basins and gross pollutant traps to ensure the stormwater drainage network
is operating effectively]
Cyclic Inspections3 Culvert/pipes inlets & outlets Six monthly
Major GPTs at Sunshine Beach, Noosa 4 times per year (quarterly)
Junction, Hastings St, Cooyar St.
Minor GPTs 3 times per year (tri-annual)
Note: Audit done on bio-retention
basins and data validated. Program
being developed to bring these
assets to standard and then
operating costs will need to be
funded in budget for routine
maintenance work. Currently not
done – service gap.
Park Road slip area (beginning of
Boardwalk to First Point):
Subsoil drainpipe camera check Annually
Dipping points checked/cleaned Quarterly
During intense rainfall Weekly
Scheduled Work As identified from inspections (defects & proactive interventions) to maintain free
flow of stormwater with specific requirements as follows:
GPTs (major) 4 times per year (quarterly)
Note: Audit done on bio-retention
basin and data validated. Program
being developed to bring these
assets to standard and then
operating costs funded in budget for
routine maintenance work.
GPTs(minor) 3 times per year (tri-annual)
De-silting of stormwater lines As required
Reactive work 4 All requests 20 business days (target days for
completion)
Stormwater “as constructed” search 2 business days
Flood alert & mitigation maintenance and operations
[Works to maintain, repair and operate the flood alert system and flood mitigation infrastructure]
Cyclic inspections Flood alert towers/structures Annual
Flood alert stations (telemetry) Annual (with BOM technician)
Flood maximum height gauges (static Annual
measuring tool in event of telemetry
failure)
Daintree Estate5 flood mitigation &
drainage inspections check:
Concrete and earth levee (qualified Annual (September)
professional)
Level of debris/blockages along Annual pre-wet season + as required
levee wall
culverts and ensure clear of debris Annual pre-wet season + as required
blockage
Page 159
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.