Original source · versioned page text
Level of Service Catalogue 2019-20
The original of this document is very large (11.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ACTIVITY SERVICE LEVEL TARGET
Scheduled work As identified from inspections (defects & proactive interventions) with specific
requirements as follows:
Purchase 6 bottles of nitrogen gas (used Annual
for creek level measurements) and 6
batteries
Note: one spare repeater and two spare
telemetry canisters held in stock at all
times and replaced as necessary.
Daintree Estate flood mitigation system 18 cuts per year
– mowing (included as part of Park
mowing service for Leafhaven Park)6
SERVICE DELIVERY MODEL
Service is delivered internally with support from external contractors as required.
KEY SERVICE METRICS
Measure Metric Benchmark Comparison
Cost to maintain stormwater infrastructure per $114 per rateable FY2016/17 actuals $3.49M / 30,000
rateable property property rateable properties
FY 2017/18 actuals $3,408,497 / 30,000 rateable = $116 per rateable property
properties
PERFORMANCE MEASURE
Service Indicator Performance Measure Methodology
Drainage & Flood Satisfaction Noosa community satisfaction Community satisfaction mean
Mitigation mean rating score compared to performance rating from the LGAQ
the State mean rating score Community Satisfaction Tracking
(out of optimum rating of 5). Survey for Provincial areas for:
NSC mean State mean Theme: Basic Services &
rating (2019) rating (2017) Infrastructure
3.64 3.49 Function: Drainage & Flood
Mitigation
1 Refer to Asset Responsibility Matrix for specific areas of responsibility
2 Source Stormwater Asset Management Plan adopted 22 October 2015 – data subject to further validation.
3 Source Recurrent Maintenance Manual.
4 Reactive maintenance requests are assessed as to warrant for work and available budget – emergencies
responded to same day.
5 Daintree Estate Disaster Management Plan 08/07/2016.
6 Source Road Landscaping Maintenance Contracts - 1718Q014
Page 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.