ACTIVITY SERVICE LEVEL TARGET
Traffic Signal (Traffic Light) Maintenance
Activities include cyclic inspections and routine maintenance of traffic management infrastructure such as traffic
lights. Note: Maintenance of other traffic management infrastructure such as signs & traffic control devices is
undertaken as part of routine road maintenance activities.
Cyclic work Traffic signal / lights inspected (contract) Quarterly
Scheduled work Work as identified from quarterly inspections
Reactive work Traffic lights maintenance / timing issues / Separate contract arrangements due to
(Triggered by customer responding to faults caused by vehicular specialised service, with response times
requests) crashes and or vandalism (contract) dependent on the magnitude of the problem,
but generally same day due to the impacts
on traffic if not functioning properly.
Operations
Activities include road safety investigations, audits, identification of infrastructure deficiencies, development of
remedies, implementation of traffic improvements including speed limit adjustments, traffic noise complaints,
visibility & sight line issues, requests for new signs and lines and other measures to ensure that the road network is
safe and traffic movements are effectively controlled and processing applications for heavy vehicles to use local
roads.
Cyclic activities Noosa Speed Management & Traffic Quarterly (if required)
Advisory Committee Meetings
Regional Roads Group Meetings (SafeST; Quarterly (if required)
Black Spot; etc.)
Scheduled activities Data Collection and Analysis Fortnightly data collection / download of all
Linear Automatic Counters: permanent counters and as needed for non-
- Traffic Counters (Permanent) permanent counters.
- Traffic Counters (Non-Permanent)
- Cycle Counters (Permanent) Data analysis by traffic engineering staff
- Cycle Counters (Non- Permanent) within 60 business days and dependent on
- Pedestrian Counters (Permanent) resourcing.
- Pedestrian Counters (Non-permanent)
Intersection Counts:
Intersection counts undertaken on a needs
- Manual Counts (internal staff)
basis where turning movements and queue
- Video Counts (external provider)
length data is sought.
Cycle Grant Activities Preparation of Funding Grant Applications
for cycling infrastructure. Annual preparation of funding grant
Includes grants for planning, design and applications (December / January).
delivery of on-road facilities, off-road
pathways, data counters, end of trip facilities,
wayfinding signage, etc.
On-going Management of the Cycle Grant
Program.
Reporting to TMR and internal progress Monthly progress reporting to TMR, plus
meetings. weekly internal progress meetings.
Capital Works Planning Development of future capital works As required dependent on traffic engineering
projects: issues that arise and/or as input is required
Identification of existing infrastructure into civil design projects.
deficiencies through traffic investigations and
development of remedies.
Traffic modelling to inform:
Future road / intersection improvements
Civil designs of existing capital projects.
Civil design reviews:
Review of traffic engineering aspects of civil
design proposal.
Reactive activities Issue Target days for completion
Heavy Vehicles: Assessment and approval 20 business days (target)
(including conditioning) or refusal of Freight and
Heavy Vehicle applications to utilise the local
Noosa road network.
(Statutory time limit of 28 days in accordance with
the National Heavy Vehicle Law)
Page 162
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.