Delegated Report - Code - Planning OPW26 0033 (As Published)

of 27
                      d.      establishment of a communication protocol with the general public, adjoining owners,
                              emergency services and local businesses to advise of agreed construction times,
                              impacts on traffic and services and other relevant issues;
                      e.      include a post out to the local residents and businesses advising of the proposed
                              development, the expected time frames and the site contact details;
                      f.      include signage in prominent locations on the boundaries of the site advising of the
                              proposed development, the expected time frames and the site contact details;
                      g.      identification of complaint management procedures including:
                              i.       contact details for the on-site manager; and
                              ii.      dispute resolution procedures.
                      h.      details on the location of external fill/dump sites/sources, the haulage route, type of
                              vehicle to be utilised during filling operations and frequency of usage.
                              Any damage to the existing road system as a result of haulage operations shall be fully
                              repaired at the applicant’s expense.
               11.    All necessary approvals from external service providers (e.g., Unitywater) and external
                      parties on which the development works are proposed have been obtained and a copy
                      supplied to Council.
               12.    Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to council in writing within five business days of the
                      change occurring.
               13.    Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.
               VEGETATION PROTECTION
                      Retention of Existing Trees and Vegetation
               14.    All trees and vegetation identified for retention must be protected in accordance with
                      AS 4970, Protection of trees on development sites.
               15.    A qualified person (*) must be engaged for the duration of the works to:
                      a.      Oversee installation of all tree protection fencing prior to commencement of any works
                              onsite (including any clearing).
                      b.      Supervise tree protection within the development site and frontages, prior to, during
                              and following construction in accordance with AS4970, Protection of trees on
                              development sites.
                      c.      Oversee approved tree removal in proximity to retained trees.
                      d.      Undertake a risk assessment of all trees within striking distance of the development
                              works and site and carry out hazard removal and amenity pruning in accordance with
                              AS 4373, Pruning of amenity trees.
                              (*) Refer to Advisory Note
               16.    Vegetation areas for protection must:
                      a.      Be protected in accordance with the approved Tree Protection Plan(s) listed in this
                              Decision Notice.
                      b.      Be protected with a minimum 1.2m high temporary safety fence (or temporary barrier
                              mesh / three-strand wire with pickets at 3m centres or flagging / bunting).
                      c.      Have the fence installed prior to the prestart meeting and maintained for the entire
                              period of construction.



                                                                                                      Page 13 of 27

Document Set ID: 25027781
Version: 3, Version Date: 13/08/2026

Log in to download the original (Delegated Report - Code - Planning OPW26 0033 (As Published).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.