Skip to the record
Accept no substitutions.

Council archive · source document

00155818.001

of 16

Text shows just the words. Original shows the document exactly as it was published.

Text sections not matched to the original PDF pages. See original document to check page numbers.

NOOSA COUNCIL IDAS Development Application Decision Notice                                                       10

70.    To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted
       in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are
       available at www.adac.com.au).

71.    Any damage caused to any public utility during the course of construction shall be repaired to Council’s
       standards and at no cost to Council.

72.    Any alteration of any public utility or other facilities necessitated by the development of the land or
       associated construction works external to the site shall be at no cost to Council.

73.    The transportation of all materials to and from the site shall be undertaken in a manner such that no
       particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
       be covered to prevent materials including dust being windblown from the vehicle.

74.    As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design
       intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services
       and structures. All of which shall be submitted to Council for checking and for Council’s records.
       The data must fully detail levels for all engineering works including but not limited to drainage structures,
       finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
       As Constructed (ADAC) digital format.            (Guidelines on the use of ADAC are available at
       www.adac.com.au).
       Approval of works shall not be granted until all As Constructed information has been supplied and
       accepted by Council.
Environmental Health
75.    An annual licence and registration of the premises is required under the Food Hygiene Regulations of
       1989 from Council’s Environmental Health Section where unpackaged food is sold, prepared, packed,
       stored, handled, served or supplied for sale.

76.    The developer must provide a suitably screened imperviously paved area large enough for all refuse and
       recycling containers. A roofed wash down area is required with a cold-water tap, hose and drain outlet
       connected to sewer.

77.    Refuse containers must be provided in accordance with the requirements of the Environmental Protection
       (Interim Waste) Regulations 1996 and (Waste Management) Regulation 2000, for the storage and
       collection of refuse.

78.    The development must allow refuse-loading areas to be located off street. All vehicles associated with the
       collection of waste/recyclables, shall enter and leave the site in a forward direction.

79.    Street litter bins to a design approved by Council, shall be supplied and installed at the developers
       expense at agreed locations.

80.    A Waste Management Plan is to be submitted for specified developments as determined by the
       Manager Environmental Health Services for the day to day operation of the complex. The Waste
       Management Plan is to be submitted with development applications for material change of use (MCU)
       and approved prior to commencement of operational works.
       The Waste Management Plan Strategy will include the following information:-
          The types of waste that will be generated from the activities approved within the development.
            Estimated volumes or tonnage of recyclables within the generated waste stream
            Estimated volumes or tonnage of waste generated from the activities.
            Methods to be used for dealing with garden waste.
            Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling.
            Description of procedures involving disposing of refuse to bins; the storage of bins and the
              collection of bins by the contractor and who is responsible for each transfer of the waste.
            A description of the design details of waste storage and recycling areas including methods of
              prevention of storm water contamination. To be high lighted on plans.
            A description of types and volume of waste storage containers to be used.



AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@e808d94f\@[email protected]

Used in these records

About this file

File size
71 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

00155818.001.pdf · 71 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.