NOOSA COUNCIL IDAS Development Application Decision Notice                                                       7

44.    A new concrete path shall be constructed along the Elizabeth Street frontage of the site and to a minimum
       width of 1.5 metres in accordance with Council’s design standards and to an alignment that protects any
       significant vegetation or any underground services.

45.    New Kerb & Channel in accordance to Council’ standards and specifications shall be provided for the
       whole of the Elizabeth Street frontage of the property.

46.    Parking bays along the Gympie Terrace frontage shall be line marked and sign posted for a 2hr limit
       consistent with parking restrictions along the south side of Gympie Terrace east of the site. The parking
       bays shall comply with Australian Standards in terms of sizes.

47.    All paths shall be designed and constructed to ensure pedestrian safety using non-slip materials and to
       produce an evenly graded surface finish.

48.    All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath
       paving and landscaping such as trees and grasses in accordance with Council’s Standard specifications
       prior to commencement of the use permitted by this permit.

49.    All redundant stormwater kerb outlets from the site shall be removed and the kerb be repaired or replaced
       at that location to the satisfaction of Council’s supervisor.
Pathway Contributions
50.    A pathway contribution of $1,049 towards external major pathways, in accordance with Planning Scheme
       Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior to obtaining a
       Development Permit for Operational Works. This amount will be subject to variations in the Consumer
       Price Index, All Groups Brisbane from December 2004 until the date of payment.
Stormwater Drainage
51.    All stormwater drainage shall be collected on site and discharged so there is no net increase in
       stormwater runoff from the site. Plans of the drainage design shall be prepared by a Registered
       Professional Civil Engineer and submitted to Council prior to obtaining a Development Permit for
       Operational Works. Stormwater drainage permitted to drain from the site and be discharged in one or
       combination of the following::

       51.1. To Council’s existing drainage structures in both Gympie Terrace and Elizabeth Street.

       51.2. To Council’s kerb & channel street drainage system in both Gympie Terrace and Elizabeth Street.
              The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street
              drainage system at any one location is 25 litres/second.
52.    To ensure that polluted run-off does not enter Council’s stormwater drainage system, stormwater run-off
       from the carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or hose-
       down) collected in a grease/oil arrestor provided on site prior to being permitted to discharge into
       Council’s drainage system.
       All other clean stormwater, such as roof water, can be collected on site and discharged through a single
       underground drain line directly into the existing drainage system, bypassing the grease/oil arrestor.
       To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil arrestors, which
       shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational
       Works.
       The approved maintenance plan shall be incorporated in the Community Management Scheme for the
       development and a copy of this shall be provided for Council’s records prior to commencement of the
       approved Use.
       A Development Permit for Building Works shall not be granted until a Development Permit for Operational
       Works has been issued in regard to the drainage scheme.
53.    All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
54.    The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
       accordance with Council’s standards and requirements at no cost to Council.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@e808d94f\@[email protected]

Used in these records

About this file

File size
71 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

00155818.001.pdf · 71 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.