Skip to the record
Every meeting, every word.

Council archive · source document

08/0774 - Decision Notice [As Published] · 142008.774

of 7

Text shows just the words. Original shows the document exactly as it was published.

                                              -3-                                 2008/774


16.     Certification by a Registered Professional Engineer of Queensland that states that the
        jetty is constructed in accordance with best practice methods and is structurally sound
        shall be submitted to Council prior to the return of any bond monies held by Council.
        A final inspection and approval of the structure by Council’s Inspector is also required
        prior to the return of any bond monies held by Council. Please contact Council’s
        Land Development Section to arrange the inspection.
17.     The jetty shall be licensed with the Council upon completion of the structural work and
        shall be licensed annually thereafter
5       REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger           Referral          Referral Agency      Referral Address
                            Status

 Nil

6       APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the
following table:
 Plan / Document Rev. Plan / Document Name                               Date
 No.
 08/56-1                         Elevation 1, Elevation 2, Framing April 2008
                                 Layout & Site Plan – John Norden &
                                 Associates
 08/56-2                         Typical Section, Detail 1, Detail 2 & April 2008
                                 Detail 3 – John Norden &
                                 Associates

7       ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions
of approval:
THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO
NOT FORM CONDITIONS OF APPROVAL
1. Should any changes or modifications to the approved plans be required as a result of
   construction constraints, a Change to an Existing Approval Application under the
   Integrated Planning Act must be made. Amended plans clearly indicating the changes
   must be lodged with this application along with the appropriate fees.
2. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999
   and Local Law No. 12, prevents a builder or building contractor carrying out building
   work on a building site in a way that makes or causes audible noise to be made from
   the building work:-
      2.1. On a Sunday or public holiday, at any time; or
      2.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
      A maximum penalty of $1,500 applies to an offence under this legislation.

Used in these records

About this file

File size
55 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0774 - Decision Notice [As Published].pdf · 55 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.