identification of complaint management procedures including:
i. contact details for the on-site manager; and
ii. dispute resolution procedures.
11. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.
12. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering
13. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets must
be repaired immediately where it creates a hazard to the community. In circumstances where
the damage does not create a hazard to the community, it must be repaired immediately on
completion of the works associated with the development.
14. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
who is independent of the Developer and Principal Contractor, and they must certify that all
works conform to the Operational Works permit. Where municipal works are involved, such
confirmation must be submitted for the respective hold points prior to any site inspection by
Council Officers.
15. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice.
b. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines.
c. The relevant conditions of the higher order Material Change of Use approval viz
MCU24/0153 to which this approval relates.
d. The latest version of the Healthy Waterways document “Water Sensitive Urban Design
Technical Design Guidelines for South East Queensland” for all water quality devices
to be constructed on site.
Retention of Existing Trees and Vegetation
16. All trees and vegetation identified for retention must be protected in accordance with AS
4970, Protection of trees on development sites.
17. A qualified person * must be engaged for the duration of the works to:
a. Supervise tree protection within the development site and frontages, prior to, during
and following construction in accordance with AS 4970, Protection of trees on
development sites.
b. Supervise and undertake necessary tree protection for all trees affected by the
development on neighbouring Lots. This includes tree identified in the approved
arborist report as outside project scope within the neighbouring properties east of the
development site. Where trees within neighbouring properties are found to be unsafe
due to works relating to this development approval, the developer is solely responsible
for the removal and replacement of these trees.
c. Oversee approved tree removal in proximity to retained trees.
*(Refer to Advisory Note)
Vegetation Clearing
18. Removal of trees and vegetation must be undertaken by a qualified person* and must
include:
Page 11 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice MCU24 0153 & OPW24 0202 (As Published).pdfRelated documentApplication case desk ↗
Negotiated Decision Notice MCU24 0153 & OPW24 0202 (As Published).pdfRelated documentApplication case desk ↗
Negotiated Decision Notice MCU24 0153 & OPW24 0202.pdfRelated documentApplication case desk ↗
Negotiated Decision Notice MCU24 0153 & OPW24 0202.pdfRelated documentApplication case desk ↗
About this file
- File size
- 221 KB (small file)
- File type
No other editions are linked here.