Negotiated Decision Notice MCU24 0153 & OPW24 0202 (As Published) · MCU24/0153

of 22

Text shows just the words. Original shows the document exactly as it was published.

                      b.      be calculated using a schedule of works and relevant bond equation;
                      c.      be lodged with Council and accompanied by the Bond Administration Fee/s; and
                      d.      be requested for release by writing to Council, when relevant approval requirements
                              have been met.
               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               5.     All necessary approvals from external service providers (e.g., Unitywater) and external
                      parties on which the development works are proposed have been obtained and a copy
                      supplied to Council.
               6.     A condition report of the drainage system must be completed for agreement at the prestart
                      meeting. The condition report is to include a CCTV inspection of the existing field inlet
                      (labelled as “7/1”) to the next downstream structure, inclusive.
               7.     A condition report including photographs of the frontage of the site must be completed and
                      submitted to council at the prestart meeting / prior to any works commencing.
               8.     Certificates demonstrating currency of public liability insurance and works insurance covering
                      the works must be submitted to Council prior to the prestart meeting.
               9.     Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Civil engineering works;
                      b.      Landscape works;
                      c.      Erosion and sediment control works; and
                      d.      Other relevant parties.
               10.    A Construction Management Plan must be submitted to Council prior to the pre-start meeting
                      and must specifically address the following:
                      a.      Traffic Management during all aspects of the construct phase including:
                              i.       A Traffic Management Control Plan in accordance with Manual of Uniform Traffic
                                       Control Devices (MUTCD) detailing all temporary signage and traffic control
                                       measures prior to construction.
                              ii.      Maintenance of safe vehicle and pedestrian access across the frontage of the
                                       site both during daily construction and after daily construction has ceased.
                              iii.     Proposed fencing to the site during the construction phase of the development.
                              iv.      Adequate parking arrangements for construction workers.
                              v.       No queuing of trucks is permitted on residential streets, especially prior to
                                       7.00am. Further parked trucks must have engines turned off
               Maintenance and protection of water quality and existing drainage lines through the construction
               site through the implementation of appropriate erosion and sediment control measures.
               Works programme identifying key components of the works and their respective durations.
               Establishment of a communication protocol with the general public, adjoining owners, emergency
               services and local businesses to advise of agreed construction times, impacts on traffic and
               services and other relevant issues.
               Include a post out to the local residents and businesses advising of the proposed development,
               the expected time frames and the site contact details.
               Include signage in prominent locations on the boundaries of the site advising of the proposed
               development, the expected time frames and the site contact details.



                                                                                                       Page 10 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Used in these records

About this file

File size
221 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Decision Notice MCU24 0153 & OPW24 0202 (As Published).pdf · 221 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.