               40.    All building materials containing asbestos products are wrapped and disposed of in
                      accordance with the Public Health Regulation 2006 and the Environmental Protection
                      Regulation 2008. Note: Asbestos is a Regulated Waste. The Department of Environment &
                      Science licenses businesses that transport asbestos waste, and landfills that accept this
                      waste.
                      General
               41.    Infrastructure including reticulated water, sewerage, stormwater, and electricity must be
                      protected from damage and made safe to the standard required by the regulatory authority.
               42.    Any damage to footpaths, street plantings, natural vegetation/trees, kerb and channel,
                      bridges or roadways at the removal/demolition site must be repaired or reinstated to at least
                      pre-existing conditions.
                      Plumbing and Drainage
               43.    It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that at
                      demolition of a building, the existing sanitary drain upstream from the connection point for a
                      service provider’s sewerage system must be sealed water tight. This work is deemed as
                      notifiable Work and must be carried out by a suitably licenced plumber who must submit an
                      As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland Building
                      Construction Commission) within 10 days of completing the work.
               5.     REFERENCE DOCUMENTS

                Plan No.               Rev.   Plan/Document Name                              Date

                MNA_205215_33 00              33 ROSS CRESCENT, SUNSHINE BEACH                22 January 2025
                Ross   Crescent
                                              Coastal Hazard Assessment prepared by
                Sunshine Beach
                                              Moffatt and Nichol

                24096-001              0      Geotechnical Investigation     prepared by 18 June 2024
                                              Tectonic Geotechnical &        Environmental
                                              Engineers

                S24-043                       Stormwater Management Report prepared by 3 July 2024
                                              Westera Partners

                S24-043                       Letter titled Response to Council’s Request for 4 September 2024
                                              Information prepared by Westera Partners

               6.     REFERRAL AGENCIES

               Not applicable.




                                                                                                      Page 8 of 13
Document Set ID: 23687199
Version: 2, Version Date: 14/04/2025


[OCR of page images]
40.

41.

42.

43.

All building materials containing asbestos products are wrapped and disposed of in
accordance with the Public Health Regulation 2006 and the Environmental Protection
Regulation 2008. Note: Asbestos is a Regulated Waste. The Department of Environment &
Science licenses businesses that transport asbestos waste, and landfills that accept this
waste.

General

Infrastructure including reticulated water, sewerage, stormwater, and electricity must be
protected from damage and made safe to the standard required by the regulatory authority.

Any damage to footpaths, street plantings, natural vegetation/trees, kerb and channel,
bridges or roadways at the removal/demolition site must be repaired or reinstated to at least
pre-existing conditions.

Plumbing and Drainage

It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that at
demolition of a building, the existing sanitary drain upstream from the connection point for a
service provider's sewerage system must be sealed water tight. This work is deemed as
notifiable Work and must be carried out by a suitably licenced plumber who must submit an
As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland Building
Construction Commission) within 10 days of completing the work.

REFERENCE DOCUMENTS

Plan No. Rev. | Plan/Document Name Date

MNA_205215_33 00 33 ROSS CRESCENT, SUNSHINE BEACH 22 January 2025

Ross Crescent
Sunshine Beach

Coastal Hazard Assessment prepared by
Moffatt and Nichol

24096-001 0 Geotechnical Investigation prepared by | 18 June 2024
Tectonic Geotechnical & Environmental
Engineers

$24-043 Stormwater Management Report prepared by | 3 July 2024

Westera Partners

$24-043 Letter titled Response to Council's Request for | 4 September 2024

6.

Information prepared by Westera Partners

REFERRAL AGENCIES

Not applicable.

Document Set ID: 23687199

Page 8 of 13

Version: 2, Version Date: 14/04/2025

Used in these records

About this file

File size
424 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Decision Notice - MCU24 0094 [As Published].pdf · 424 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.