Approved Decision Notice - MCU24 0094 [As Published] · MCU24/0094
*(Refer to Advisory Note)
Revegetation of the coastal setback
29. Prior to the commencement of use the applicant shall undertake revegetation of the coastal
setback. The revegetation, shall be 5.0 metres in width from the seaward or rear boundary
of the site and shall include a mix of native landscaping such as ground covers, shrubs and
trees to provide adequate landscape buffering to protect the coastal dune system.
Plantings are sourced from the Noosa Plan 2020 - PSP2 Landscaping planning scheme
policy and maintained for the life of the use at the site.
(* Refer to Advisory Note)
30. Where damage occurs to any Council asset as a result of the development works, it must be
repaired immediately where it creates a hazard that presents risk to person or property. Other
damage must be repaired prior to completion of works.
Retention of Existing Trees
31. Existing trees in the road reserve must be assessed by a qualified person* and retained and
protected where possible. Where mature trees are to be removed, reasonable grounds must
be given by the qualified person*.
DEMOLITION WORKS
32. Unless specifically conditioned otherwise, all works must comply with the relevant acceptable
solutions as contained in the Waste Management Code and Water Quality and Drainage
Code of the Noosa Plan 2020.
Works
33. Demolition must be undertaken in a manner that causes no detrimental effect upon the
amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions
in accordance with the nuisance provisions of the Environmental Protection Act 1994.
Waste Management
34. Adequate area must be provided on-site for the collection and separate storage of recyclable,
non-recyclable, vegetative and hazardous materials in their specific waste streams during
removal or demolition works.
35. All waste materials must be removed from the site to avoid causing unhealthy conditions,
with the site left clean, tidy and free from any debris.
36. Where a development permit has not been issued for the future use of the site, hard surfaced
areas including concrete slabs must be removed and disturbed areas must be revegetated
in accordance with PSP2 Landscaping of the Noosa Plan 2020. Alternatively, the site must
be turfed within 20 business days of completing the removal or demolition work. Health and
Safety
37. All building materials containing asbestos, including asbestos cement sheeting or roofing and
lagging, are removed from the building prior to demolition or relocation.
38. Removal of building materials containing asbestos must be undertaken by a licensed
asbestos removalist.
39. Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
requires a licensed asbestos removalist to give notice to Workplace Health and Safety
Queensland (WHSQ) of licensed asbestos removal work at least five days before the work
commences. Notification must be made using Form 65: Notification of licensed asbestos
removal work, demolition work or emergency demolition.
Page 7 of 13
Document Set ID: 23687199
Version: 2, Version Date: 14/04/2025
[OCR of page images]
29.
30.
31.
*(Refer to Advisory Note)
Revegetation of the coastal setback
Prior to the commencement of use the applicant shall undertake revegetation of the coastal
setback. The revegetation, shall be 5.0 metres in width from the seaward or rear boundary
of the site and shall include a mix of native landscaping such as ground covers, shrubs and
trees to provide adequate landscape buffering to protect the coastal dune system.
Plantings are sourced from the Noosa Plan 2020 - PSP2 Landscaping planning scheme
policy and maintained for the life of the use at the site.
(* Refer to Advisory Note)
Where damage occurs to any Council asset as a result of the development works, it must be
repaired immediately where it creates a hazard that presents risk to person or property. Other
damage must be repaired prior to completion of works.
Retention of Existing Trees
Existing trees in the road reserve must be assessed by a qualified person* and retained and
protected where possible. Where mature trees are to be removed, reasonable grounds must
be given by the qualified person”.
DEMOLITION WORKS
32.
33.
34.
35.
36.
37.
38.
39.
Document Set ID: 23687199
Unless specifically conditioned otherwise, all works must comply with the relevant acceptable
solutions as contained in the Waste Management Code and Water Quality and Drainage
Code of the Noosa Plan 2020.
Works
Demolition must be undertaken in a manner that causes no detrimental effect upon the
amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions
in accordance with the nuisance provisions of the Environmental Protection Act 1994.
Waste Management
Adequate area must be provided on-site for the collection and separate storage of recyclable,
non-recyclable, vegetative and hazardous materials in their specific waste streams during
removal or demolition works.
All waste materials must be removed from the site to avoid causing unhealthy conditions,
with the site left clean, tidy and free from any debris.
Where a development permit has not been issued for the future use of the site, hard surfaced
areas including concrete slabs must be removed and disturbed areas must be revegetated
in accordance with PSP2 Landscaping of the Noosa Plan 2020. Alternatively, the site must
be turfed within 20 business days of completing the removal or demolition work. Health and
Safety
All building materials containing asbestos, including asbestos cement sheeting or roofing and
lagging, are removed from the building prior to demolition or relocation.
Removal of building materials containing asbestos must be undertaken by a licensed
asbestos removalist.
Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
requires a licensed asbestos removalist to give notice to Workplace Health and Safety
Queensland (WHSQ) of licensed asbestos removal work at least five days before the work
commences. Notification must be made using Form 65: Notification of licensed asbestos
removal work, demolition work or emergency demolition.
Page 7 of 13
Version: 2, Version Date: 14/04/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Decision Notice - MCU24 0094 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 424 KB (small file)
- File type
No other editions are linked here.