Skip to the record
Noosa’s premier civic archive.

Council archive · source document

08/0197 - MCU - Detached House DJ Leach Pty Ltd [As Published] · 132008.197

of 68

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
SECTION 4 Section 4 must be completed when the application seeks approval to carry out operational work.

 

PLANNING SCHEME

 

41

Is any of the proposed operational work assessable under a planning scheme?
(1 No - (Go to Question 4.2 below
DD Yes - (Complete Part E of IDAS Application Form 7 and Questions 4.1.1 - 4.1.8 below)

 

STATE-CONTROLLED ROAD

 

 

444

is any part of the premises within 100m of a State-controlled toad, or part of a future State-controlled road?
LO No

If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998, schedule 5 and
does it exceed the threshold?

No
A Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
OO Yes
It yes, is all of the proposed operational work associated with the following?
* Amaterial change of use that is assessable under the planning scheme No Yes

« — Reconfiguring a tot that does not increase the total number of lots and does not LJ No (Yes
increase the total number of lots abutting the State-controlled road

if no to either or both - Answer (a) - (c) below
{a} a” of the proposed operational work associated with access to a State-controlted road?
No

0 Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(b) {s any of the proposed operational work for filling or excavation?
O No
0 Yes
Ifyes, is the operational work proposed in a future State-controlled road defined by toute?
oO No - This application must be referred to the Department of Main Roads (DMR) as Advice Agency.
(1 Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
() Does any of the proposed operational work involve the redirection cr intensification of site stormwater from the iand,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
C1 No
OO Yes
Ifyes, is the operational work proposed in a future State-controlled road defined by route?
C1 sNo- This application must be referred to the Department of Main Roads (DMR) as Advice Agency.
{1 Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
IP Regulation, schedule 2, table 3, tem 3

 

IP Regulation, schedule 2, table 3, item 1(b)

 

 

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0197 - MCU - Detached House DJ Leach Pty Ltd [As Published].pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.