Council archive · source document
08/0197 - MCU - Detached House DJ Leach Pty Ltd [As Published] · 132008.197
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
ACID SULFATE SOLS |
41.2
!s any of the operational work proposed in a local govemment area listed‘ in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils?
[] No
CJ Yes
It yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
OO No
C1 sYes
If yes, does the proposed operational work involve the following?
© Excavating more than 1,000m:? of soil or sediment at or below 5m AHD (No OC Yes
¢ — Filling the premises with 1,000m* or more of material with an average depth of 0.6m (JNo (1 Yes
on land, soil or sediment at or below 5m AHD .
ff yes to either or both - this application must fo be referred to the Department of Natural Resources and Water (NRW) as Advice Agency
IP Regulation, schedule 2, table 3, item 4
State Planning Policy 2/02: Planning and Managing Development involving Acid Sulfate Soils, section 3.6
EASEMENTS AND SUBSTATIONS
4.1.3
Is any of the proposed operational work for filling or excavation?
(0 No
(J Yes
If yes, is the filling or excavation associated with reconfiguring a lot?
1 Yes
(1 No-Answer both (a) and (b) below
(a) __|s any part of the premises subject to an easement in favour of a distribution entity or transmission entity under
the Electricity Act 1994?
1) No
LO Yes
If yes, is any of the operational work proposed to be located in any part of the easement?
1 No
0 Yes - This application must be referred to the entity as Advice Agency.
(b) Is any of the operational work proposed to be located within 10m of a substation site under the Electricity Act 1994?
No
O Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
IP Regulation, schedule 2, table 3 item 10(a)
{P Regulation, schedule 2, table 3, item 10{b}
4.14
1s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 4 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
CJ No
DO Yes
If yes, is any of the proposed operational work for filling, excavation, compaction, drilling, boring or piping, not associated
with reconfiguring a lot?
No
{) Yes
If yes, is any of the operational work proposed to be located in any part of the easement?
(0 No
(Yes - This application must be referred to the licence holder as Advice Agency.
IP Regulation, schedule 2, table 3, item 17
+ Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cootoola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Momington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
-30-
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0197 - MCU - Detached House DJ Leach Pty Ltd [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.