Council archive · source document
08/0197 - MCU - Detached House DJ Leach Pty Ltd [As Published] · 132008.197
"INTEGRATED PLANNING ACT 1997, IDAS Assessment Checkiist, Version 21.0, 3 September 2007
PUB
LIC PASSENGER TRANSPORT
4.1.5 |\s any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed
the specified threshold?
No
[1 Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, tem 14
RAILWAY SAFETY AND EFFICENCY
4.16
Is any of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed
the specified threshold?
0 No
LD Yes - This application must be referred to Queensland Transport (QT)as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 15
KOALA CONSERVATION
4A7
Is any part of the premises in a koala conservation area or koala sustainability area?
DD No
DO Yes
If yes, is all of the proposed operational work associated with a material change of use or reconfiguring a lot for which
teferral is required in relation to koala conservation (i.e. did you answer ‘yes’ to all questions in ether Q2.1.8 or Q 3.12)?
QO Yes
OO No
If no, is the proposed operational work for a domestic activity, as defined by the IPA?
O] Yes
CI No
If no, will the activity result in the following?
© — Clearing of native vegetation over an area greater than 2,500m2 []No (] Yes
¢ — Extracting gravel, rock or sand from an area greater than 5,000m2 [JNo [] Yes
© — Excavating or filling an area greater than 5,000m? [CINo [1 Yes
if yes to one or more - this application must be referred to the Environmental Protection Agency (EPA) as Concurrence Agency.
JP Regulation, schedule 2, table 3, item 19
WILD
development for the purposes of the Wild Rivers Act 2005, currently no declarations for any of the wild river areas apply the Wild Rivers
code to that type of development.
RIVER AREA - Although legislation provides for assessment of operational works for residential, commercial and industrial
ASSO
AREA
CIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
4.2
|s any of the proposed operational work associated with reconfiguring a lot, if the reconfiguration is also assessable?
[) No
CL) Yes
If yes, is any part of the premises in a wild river area declared under the Wild Rivers Act 2005?
0 No- (Complete Part E) The operational work associated with reconfiguring is assessed by the local government.
OO Yes
lf yes, is the proposed operational work for residential, commercial or industrial purposes outside a designated urban
area, as defined by the Wild Rivers Act 2005?
(_No- (Complete Part E) The operational work associated with reconfiguring is assessed by the local government.
OO Yes {Complete Part E) The operational work associated with reconfiguring is assessed by the local government, and subject
to the declaration for the relevant wild nver area, assessment by the local government is required for the purposes of the
Wild Rivers Act 2005.
IPA, schedule 8, part 1, table 4, tem 2
IP Regulation, schedule 1, part 2, table 5, item 1(c}
Wild Rivers code (Note: the code does not currently contain applicable provisions for residential, industrial or commercial development inside a designated urban area)
-HM-
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0197 - MCU - Detached House DJ Leach Pty Ltd [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.