Council archive · source document
08/0197 - MCU - Detached House DJ Leach Pty Ltd [As Published] · 132008.197
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007 DECLARED FISH HABITAT AREA; WILD RIVER AREA 4.13 Is any of the proposed operational work to be carried out completely or partly within a declared fish habitat area under the Fisheries Act 1994 2 No CJ] Yes If yes, indicate what the operational work is reasonable necessary for (Tick applicable box/es) ¢ — The maintenance of existing structures, including for example the following structures, ([]No ([] Yes if the structures were constructed in compliance with all the requirements, under any Act, relating to a structure of that type - « Boatramps, boardwalks, drains, fences, jetties, roads, safely signs, swimming enclosures and weirs; « — Existing powerlines or associated powerline infrastructure e — Educational or research purposes relating to the fish habitat area OONo (Yes * — Monitoring the impact of development on the declared fish habitat area OONo (7) Yes ¢ Other purposes (ONo (Yes If yes to “other purposes”, is that proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005? OC No- (Complete Part O2) This application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If DPI&F is not the Assessment Manager for the application, the agency will have jurisdiction as Concurrence Agency. Ol Yes If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005? (Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive it. (Complete Part Oz) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F) and assessment for the purposes of the Wild Rivers Act 20085. if DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. C1 No If no, is any of the proposed operational work to be carried out in a wild river high preservation area? [] — No- Unless the application is consistent with any property davelopment plan applying to the land, the Assessment Manager must refuse to receive it. (Complete Part O2) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005, If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. oO Yes - An application for the operational work would be taken to be not properly made and the assessment manager must refuse to receive the application, IPA, schedule 8 part 1, table 4, item 7 IPA, schedule 8. part 2, table 4, item 3 JP Regulation, schedule 2, table 2, item 25 IP Regulation, schedule 1, part 3. table 4. item 7 Wild Rivers Act 2005, sections 43A Fisheries Act, section 76DC (wild river area)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0197 - MCU - Detached House DJ Leach Pty Ltd [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.