Council archive · source document
08/0197 - MCU - Detached House DJ Leach Pty Ltd [As Published] · 132008.197
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA
4.14 | Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
LC Ne
LJ Yes
If yes, indicate what the proposed operational work is reasonably necessary for (Tick applicable box/es}
e The removal, destruction or damage of dead marine wood on unallocated State land, CiNo (Yes
other than in a wild river area, for trade or commerce
« The maintenance of existing structures, including, for example, the following [No [) Yes
structures, if the structures were constructed in compliance with all the requirements,
under any Act, relating to a structure of that type —
« — boat ramps, boardwaiks, drains, fences, jetties, roads, safety signs, swimming
enclosures and weirs;
« — existing drainage structures;
« — existing powerlines or associated powerline infrastructure
For educational or research purposes or for the monitoring the impact of development [7] No DD Yes
on marine plants
© Other purposes CNo (1) Yes
Ifyes to “other purposes’, is that proposed operational work to be carried out in a wild river area declared under
the Wild River Act 2005?
(1 ___No- (Complete Part Oz) This application requires assessment by the Department of Primary Industries and Fisheries
(DPI&F), if DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.
OO Yes .
If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
(1 Yes - Unless the application is consistent with any property development plan applying to the Jand, the
Assessment Manager must refuse to receive it. (Complete Part O2) This application requires assessment
by the Department of Primary Industries and Fisheries (DPI&F) and, subject fo the declaration for the
relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
0 No
If no, is all of the proposed operational work necessary and unavoidable part of installing or
maintaining works of infrastructure required to support other development for which a development
permit is not required or, if a development permit is required, the permit is held or has been applied
for?
oO Yes — Unless the application is consistent with any property development plan applying to the land, the
Assessment Manager must refuse to receive it. (Complete Part O2) This application requires
assessment by the Department of Primary Industries and Fisheries (DPI&F) and, subject fo the
declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005.
if DPI8F is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
(1 ___No- An application for the operational work would be taken to be not properly made and the Assessment
Manager must refuse fo receive it.
IPA, schedule 8, part 1, table 4, tem 8
IPA, schedule 8, part 2, table 4, item 4
IP Reguiation, schedule 2, lable 2, item 29
IP Regulation, schedule 1, part 3, table 4, dem 8
Fisheries Act 1994, section 76DB {wild river area)
Wild Rivers Act 2005, section 43A
4.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0197 - MCU - Detached House DJ Leach Pty Ltd [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.